ELE03-00857
| ELE-Aging Inspection | 7/7/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | | DONE |
|
|
was done by 331
7/14/2003 8:22:04 AM
|
ELE03-00860
| ELE-Aging Inspection | 7/7/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | | DONE |
|
|
was done by 331 7/14/2003 8:22:49 AM
|
ELE03-01976
| Electrical Rough-In | 7/3/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | A | NR |
|
|
warren eupher ground inspection between 10-12 if possible???; Phone #: ###-#### Internet Inspection Request from: Barbara Moore nr talked with contractor 7/7/2003 10:16:09 AM
|
ELE03-00368
| Final | 7/3/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | A | NR |
|
|
darryl; Phone #: ###-#### Internet Inspection Request from: Barbara Moore not ready called 7/7/2003 9:32:45 AM
|
ELE03-01956
| Rough-In Permanent Service | 7/3/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | A | NR |
|
|
RE-INSP-- LESLIE ###-####-CELL OR ###-#### -CALL 1ST BEFORE INSP called open jboxes in attic and shall use manufactures listed breakers for a/c and furnace 7/7/2003 10:41:36 AM
|
ELE01-02879
| Final | 7/6/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/6/2003 at 10:47:28 AM. Contact: ###-####. cor. and $42.00 fee due posted met with contracor needs gfci all bath recepts shower trims, complete all wiring install approved light with clearence in MB closet 7/7/2003 1:57:44 PM
|
ELE03-01994
| Permanent Service | 7/7/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | P | PASS |
|
|
###-#### mitch p/s o/h rec. ok 7/7/2003 4:13:42 PM
|
ELE02-03884
| ELE-Request for Extension | 7/7/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | P | PART |
|
|
###-#### bob called no answer, ok for extention 7/7/2003 4:50:34 PM
|
ELE03-00057
| Electrical Rough-In | 7/7/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 7/7/2003 at 11:02:17 AM. Contact: ###-####. ok see high lighted ceilings and soffits on plans 7/7/2003 2:45:22 PM
|
ELE03-01419
| Electrical Rough-In | 7/7/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | P | PART |
|
|
conference needs to replace EMT bent with non approved bender conduit damaged
|
ELE03-01970
| Final | 7/3/2003 | 7/7/2003 | 7/7/2003 12:00:00 AM | P | PASS |
|
|
We added 2 buck/boost transformers to 2 existing single phase circuits(1 xfrmr. per ckt.) to boost the voltage from 208 to 220. These are located at the right hand side of the panel in the back room. Customer will show you to this room. Thanks!!!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok called needs to replace sq d breakers in ge panel 7/7/2003 1:22:55 PM
|