PLM04-00217
| Plumbing Rough-in | 7/2/2004 | 7/7/2004 | 7/7/2004 12:00:00 AM | A | PASS |
|
|
alex; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
PLM03-03900
| Plumbing Rough-in | 7/6/2004 | 7/7/2004 | 7/7/2004 12:00:00 AM | A | PART |
|
|
###-#### toli CONFERENCE lay out of plumbing with owner 7/7/2004 11:54:39 AM
|
PLM04-01855
| Water and/or Sewer | 7/6/2004 | 7/7/2004 | 7/7/2004 12:00:00 AM | A | PASS |
|
|
Bob ###-####
|
PLM04-00203
| Final | 7/6/2004 | 7/7/2004 | 7/7/2004 12:00:00 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Sonja Hankel 1. kitchen sink and half bath lav need to be caulked to counter top 2. woodford hosebibb next to front door about two inches off stucco, needs to be pushed in and secured with screws 7/7/2004 10:27:28 AM
|
PLM04-01864
| Plumbing Rough-in | 7/7/2004 | 7/7/2004 | 7/7/2004 12:00:00 AM | P | FAIL |
|
|
Josh ###-#### leak at cleanout incrawel to north and at base of stack cleanout above floor in dwv. 7/7/2004 1:35:02 PM
|
PLM04-01866
| Final | 7/7/2004 | 7/7/2004 | 7/7/2004 12:00:00 AM | P | PART |
|
|
###-#### charles okay to cover line, backflow needs to be installed and tested. 7/7/2004 2:20:30 PM
|