FIR04-00743
| INSP-Sprinkler Rough-in/Hydro | 7/6/2005 | 7/7/2005 | 7/7/2005 4:21:18 PM | P | CANC |
|
|
Contractor not ready
|
FIR05-00144
| INSP-Supply line flush | 7/6/2005 | 7/7/2005 | 7/7/2005 3:39:59 PM | P | PASS |
|
|
Underground flush passed. Canopies have been installed on pendants.
|
FIR05-00217
| INSP-Sprinkler Rough-in/Hydro | 7/7/2005 | 7/7/2005 | 7/7/2005 1:40:30 PM | P | PASS |
|
|
Wet system hydro test passed. Sprinkler piping is ok to cover.
|
FIR05-00357
| INSP-Sprinkler Rough-in | 7/6/2005 | 7/7/2005 | 7/7/2005 1:14:57 PM | A | PART |
|
|
Underground piping is ok to cover up to the gate valve. Contractor needs to submit plans showing the valve. Prior to cover on the rest of the piping the galvanized pipe needs to be removed.
|
BLD05-01407
| FIRE-Final Inspection | 7/6/2005 | 7/7/2005 | 7/7/2005 10:10:40 AM | A | CANC |
|
|
Did not perform life safety inspection due to not being able to perform the fire sprinkler inspection.
|
FIR05-00317
| INSP-Final Inspection | 7/6/2005 | 7/7/2005 | 7/7/2005 10:09:38 AM | A | FAIL |
|
|
No approved plans on site.
|
FIR04-00527
| INSP-Final Inspection | 7/1/2005 | 7/7/2005 | 7/7/2005 8:47:45 AM | A | FAIL |
|
|
Hood does not have the electrical shunt for the lights wired in yet or tested.
|
FIR05-00340
| INSP-Final Inspection | 7/6/2005 | 7/7/2005 | 7/7/2005 8:45:50 AM | A | PASS |
|
|
Permit finaled
|
FIR03-00176
| INSP-Final Inspection | 7/7/2005 | 7/7/2005 | 7/7/2005 12:00:00 AM | P | PASS |
|
|
Permit finaled
|
FIR05-00185
| INSP-Final Inspection | 7/7/2005 | 7/7/2005 | 7/7/2005 12:00:00 AM | P | FAIL |
|
|
Did not start inspection. Contractor stated that the three NAC panels are not sync'd as required. Hood in Mike's Restraunt was not finished. Existing sprinkler devices had not been pre-tested.
|
FIR04-00743
| INSP-Sprinkler Rough-in/Hydro | 7/5/2005 | 7/7/2005 | 7/6/2005 11:54:14 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 7/5/2005 at 4:23:47 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 6 2005 11:54AM.
|