ESC05-00610
| Site Preparation | 7/7/2005 | 7/7/2005 | 7/7/2005 3:48:06 PM | P | PART |
|
|
Got in touch with the RP regarding c/n, all issues are being addressed and will be completed by 7-7-05.
|
ESC05-01069
| Site Preparation | 7/6/2005 | 7/7/2005 | 7/7/2005 3:47:55 PM | P | PART |
|
|
Got in touch with the RP regarding c/n, all issues are being addressed and will be completed by 7-7-05.
|
ESC05-00984
| Tracking Control | 7/6/2005 | 7/7/2005 | 7/7/2005 3:08:45 PM | P | PASS |
|
|
|