BLD06-00400
| FIRE-Final Inspection | 7/6/2006 | 7/7/2006 | 7/7/2006 4:08:49 PM | P | FAIL |
|
|
The shell/core has not been called in for a final yet.
|
BLD04-00917
| FIRE-Final Inspection | 7/6/2006 | 7/7/2006 | 7/7/2006 4:06:10 PM | P | FAIL |
|
|
No approved plans on site.
|
BLD06-01009
| FIRE-Final Inspection | 7/7/2006 | 7/7/2006 | 7/7/2006 2:34:57 PM | P | FAIL |
|
|
I spoke to contractor about the approved hardware that is required for the two doors that exit the cashiers office. He stated that he would get it changed this weekend and would call in a new inspection for next week.
|
FIR05-00827
| INSP-Final Inspection | 7/7/2006 | 7/7/2006 | 7/7/2006 2:32:54 PM | A | PART |
|
|
The second floor sprinkler system is completed and approved.
|
FIR05-00800
| INSP-Final Inspection | 7/6/2006 | 7/7/2006 | 7/7/2006 2:31:53 PM | A | FAIL |
|
|
This inspection was for occupancy on the second floor. Before approval for the second floor the manual pull station at the east stairwell needs to be lowered and the smoke detector near the elevator lobby reception desk needs relocated away from the supply grill. I also need a print out of the signals that ADT received and to test the supervision of the new NAC panel on the second floor. First floor will need to be tested and the smoke fire damper on the fifth floor. Elevator recall functioned correctly for the machine room, shaft, first floor and second floor.
|
BLD05-01937
| FIRE-Final Inspection | 7/6/2006 | 7/7/2006 | 7/7/2006 12:23:23 PM | A | PASS |
|
|
Life safety finaled
|
FIR05-00830
| INSP-Final Inspection | 7/5/2006 | 7/7/2006 | 7/7/2006 12:22:53 PM | A | PASS |
|
|
Permit finaled
|
FIR06-00086
| INSP-Final Inspection | 7/6/2006 | 7/7/2006 | 7/7/2006 12:22:36 PM | A | PASS |
|
|
permit finaled
|
BLD05-03256
| FIRE-Final Inspection | 7/6/2006 | 7/7/2006 | 7/7/2006 10:54:29 AM | A | FAIL |
|
|
Fire alarm permit failed so life safety can not be finaled yet.
|
FIR06-00082
| INSP-Final Inspection | 7/7/2006 | 7/7/2006 | 7/7/2006 10:53:48 AM | P | FAIL |
|
|
Provide smoke detection for the Liebert unit and test the remaining two induct smoke detectors.
|