Inspections for the day of: Monday, July 7, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01020 BLD-Aging Inspection7/7/20087/7/20087/9/2008 10:51:23 AM DONE
Pending fire sprinkler permit final- verification of system main control valve supervision.
FIR08-00383 INSP-Final Inspection7/2/20087/7/20087/8/2008 12:14:14 PMPDEFR
Scheduled by a contractor via Hello! on 7/2/2008 at 5:17:01 PM. Contact: ###-####. Inspection rescheduled per request by contractor.
FIR08-00384 INSP-Final Inspection7/2/20087/7/20087/8/2008 12:11:32 PMPDEFR
Scheduled by a contractor via Hello! on 7/2/2008 at 5:16:15 PM. Contact: ###-####. Inspection rescheduled per contractor request.
BLD08-00681 FIRE-Final Inspection7/7/20087/7/20087/7/2008 3:41:21 PMPPASS
Life safety inspection passed, doors and hardware at three locations to be replaced per contractor and verified prior to structural final.
FIR08-00369 INSP-Supply line flush7/3/20087/7/20087/7/2008 2:27:34 PMPNR
tony/brian ###-#### Note: 1:00 Phone #: ###-#### Inspection rescheduled per conversation with contractor.
FIR06-00595 INSP-Final Inspection7/3/20087/7/20087/7/2008 2:26:43 PMAFAIL
Reviewed and reinspected defficient items noted at the previous inspection including elevator shunt trip power supervision, recall for car #3, new FJ at the pump room, new antifreeze system tamper, flow switch at the NE 2nd floor stairway, tampers at riser and floor control valves. Two remaining items in need of repair include the 5th floor NE tamper at the OS&Y sprinkler control valve, and provision for a flashing fire hat at the elevator cars upon FA device activation in the hoistway or machine room.
FIR08-00320 INSP-Final Inspection7/3/20087/7/20087/7/2008 11:40:57 AMAPASS
Scope of work completed satisfactory, fire sprinkler permit finaled.
BLD07-00813 FIRE-Final Inspection7/2/20087/7/20087/7/2008 11:14:47 AMAPASS
Fire life safety final inspection passed.
FIR07-00437 INSP-Final Inspection7/2/20087/7/20087/7/2008 11:14:10 AMAPASS
Correction notice items verified for completion, fire sprinkler permit work finaled.
FIR08-00369 INSP-Supply line flush7/1/20087/7/20087/2/2008 7:16:29 AMACANC
Scheduled by a contractor via Hello! on 7/1/2008 at 11:35:54 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 2 2008 7:16AM.