Inspections for the day of: Tuesday, July 7, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-00505 Final7/7/20097/7/20097/7/2009 4:01:15 PMPPASS
looked at sign, ok to final, no esc this project
ESC07-00987 General Inspection7/7/20097/7/20097/7/2009 3:59:58 PMPPASS
looked ok
ELE09-01187 Electrical Rough-In7/7/20097/7/20097/7/2009 3:58:02 PMPCANC
Mike ###-#### see conference, no esc this project
ELE09-01187 Conference7/7/20097/7/20097/7/2009 3:56:43 PMPDONE
Mike ###-#### talked about no cut-in boxes for new construction, provide boxes for ri, 1 1/4", make-up, stapling, being ready for inspection, no esc this project
ELE09-01192 Temporary Service7/7/20097/7/20097/7/2009 3:16:19 PMPPASS
daryl Phone #: ###-#### t/s u/g rec (n) ok, no esc this project
ELE09-01082 Final7/6/20097/7/20097/7/2009 3:04:32 PMPPASS
Rod Phone #: ###-#### ok to final, installation is ok, ok for power, no esc this project
ELE09-00963 Electrical Rough-In7/6/20097/7/20097/7/2009 1:57:03 PMPPASS
Ceiling inspection- call Fabian Luna Phone #: ###-#### Internet Inspection Request from: Sarah Bastiann ric ok, ok to cover ceiling, no esc this project
ELE09-01186 Rough-In Permanent Service7/7/20097/7/20097/7/2009 1:15:04 PMPPASS
Pump house located S. W. of residence between two properties. Silver camper traier parked right next to it. Please final if acceptable. Phone #: ###-#### Internet Inspection Request from: Dan Wright ric ok. p/s o/h rec ok, no esc this project
ELE09-01186 Final7/7/20097/7/20097/7/2009 1:14:39 PMPPASS
Pump house located S. W. of residence between two properties. Silver camper traier parked right next to it. Please final if acceptable. Phone #: ###-#### Internet Inspection Request from: Dan Wright ok to final, no esc this project
ELE09-00962 Electrical Rough-In7/6/20097/7/20097/7/2009 12:45:36 PMPPASS
Ceiling inspection- Call Fabian Luna Phone #: ###-#### Internet Inspection Request from: Sarah Bastian ok to cover ceiling, ri ok, no esc this project
ELE09-00872 Electrical Rough-In7/6/20097/7/20097/7/2009 10:39:02 AMAPASS
ceiling inspection please-Garrett Collins Phone #: ###-#### ok to cover ceiling anop, no esc this project
ELE09-00802 Electrical Rough-In7/6/20097/7/20097/7/2009 10:26:57 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Scott Kraemer corrections made, ric ok, no esc this project
ELE09-01167 Electrical Rough-In7/7/20097/7/20097/7/2009 9:35:14 AMAPASS
Scheduled by a contractor via Hello! on 7/7/2009 at 7:14:31 AM. Contact: ###-####. ok to pour concrete encased electrode
ELE09-01179 Electrical Rough-In7/6/20097/7/20097/7/2009 9:20:33 AMAPASS
Daniel ###-#### ric ok, no esc this project
ELE09-00151 Electrical Rough-In7/6/20097/7/20097/7/2009 8:08:55 AMAPART
Mike Phone #: ###-#### ok to cover mechanical room anop