ELE09-00505
| Final | 7/7/2009 | 7/7/2009 | 7/7/2009 4:01:15 PM | P | PASS |
|
|
looked at sign, ok to final, no esc this project
|
ESC07-00987
| General Inspection | 7/7/2009 | 7/7/2009 | 7/7/2009 3:59:58 PM | P | PASS |
|
|
looked ok
|
ELE09-01187
| Electrical Rough-In | 7/7/2009 | 7/7/2009 | 7/7/2009 3:58:02 PM | P | CANC |
|
|
Mike ###-#### see conference, no esc this project
|
ELE09-01187
| Conference | 7/7/2009 | 7/7/2009 | 7/7/2009 3:56:43 PM | P | DONE |
|
|
Mike ###-#### talked about no cut-in boxes for new construction, provide boxes for ri, 1 1/4", make-up, stapling, being ready for inspection, no esc this project
|
ELE09-01192
| Temporary Service | 7/7/2009 | 7/7/2009 | 7/7/2009 3:16:19 PM | P | PASS |
|
|
daryl Phone #: ###-#### t/s u/g rec (n) ok, no esc this project
|
ELE09-01082
| Final | 7/6/2009 | 7/7/2009 | 7/7/2009 3:04:32 PM | P | PASS |
|
|
Rod Phone #: ###-#### ok to final, installation is ok, ok for power, no esc this project
|
ELE09-00963
| Electrical Rough-In | 7/6/2009 | 7/7/2009 | 7/7/2009 1:57:03 PM | P | PASS |
|
|
Ceiling inspection- call Fabian Luna Phone #: ###-#### Internet Inspection Request from: Sarah Bastiann ric ok, ok to cover ceiling, no esc this project
|
ELE09-01186
| Rough-In Permanent Service | 7/7/2009 | 7/7/2009 | 7/7/2009 1:15:04 PM | P | PASS |
|
|
Pump house located S. W. of residence between two properties. Silver camper traier parked right next to it. Please final if acceptable. Phone #: ###-#### Internet Inspection Request from: Dan Wright ric ok. p/s o/h rec ok, no esc this project
|
ELE09-01186
| Final | 7/7/2009 | 7/7/2009 | 7/7/2009 1:14:39 PM | P | PASS |
|
|
Pump house located S. W. of residence between two properties. Silver camper traier parked right next to it. Please final if acceptable. Phone #: ###-#### Internet Inspection Request from: Dan Wright ok to final, no esc this project
|
ELE09-00962
| Electrical Rough-In | 7/6/2009 | 7/7/2009 | 7/7/2009 12:45:36 PM | P | PASS |
|
|
Ceiling inspection- Call Fabian Luna Phone #: ###-#### Internet Inspection Request from: Sarah Bastian ok to cover ceiling, ri ok, no esc this project
|
ELE09-00872
| Electrical Rough-In | 7/6/2009 | 7/7/2009 | 7/7/2009 10:39:02 AM | A | PASS |
|
|
ceiling inspection please-Garrett Collins Phone #: ###-#### ok to cover ceiling anop, no esc this project
|
ELE09-00802
| Electrical Rough-In | 7/6/2009 | 7/7/2009 | 7/7/2009 10:26:57 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Kraemer corrections made, ric ok, no esc this project
|
ELE09-01167
| Electrical Rough-In | 7/7/2009 | 7/7/2009 | 7/7/2009 9:35:14 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/7/2009 at 7:14:31 AM. Contact: ###-####. ok to pour concrete encased electrode
|
ELE09-01179
| Electrical Rough-In | 7/6/2009 | 7/7/2009 | 7/7/2009 9:20:33 AM | A | PASS |
|
|
Daniel ###-#### ric ok, no esc this project
|
ELE09-00151
| Electrical Rough-In | 7/6/2009 | 7/7/2009 | 7/7/2009 8:08:55 AM | A | PART |
|
|
Mike Phone #: ###-#### ok to cover mechanical room anop
|