ELE08-02970
| ELE-Aging Inspection | 7/7/2009 | 7/7/2009 | 7/15/2009 9:42:21 AM | | DONE |
|
|
Not quite ready but close. Darren said they should have it done this week.
|
ELE09-00799
| Electrical Rough-In | 7/7/2009 | 7/7/2009 | 7/7/2009 5:01:10 PM | P | PART |
|
|
Jason Phone #: ###-#### Area A ok to cover ceiling.
|
ELE09-01193
| Final | 7/7/2009 | 7/7/2009 | 7/7/2009 3:39:46 PM | P | FAIL |
|
|
Shed sits behind house. You may go behind house and do not need to contact the residence since it is a rental. Phone #: ###-#### Internet Inspection Request from: Dave Friend. Correction notice posted. NEC 110.12 Unused openings shall be closed,NEC 344.46 Where a conduit enters a box a bushing shall be provided for abrasion protection.NEC 334.15(B) Exposed NM cable shall be protected from physical damage,NEC 210.4(B) Multiwire branch circuits shall disconnect simultaneously,NEC 300.5 direct buried conduit shall be installed to meet the minimum cover requirements of table 300.5.
|
ELE09-01182
| Electrical Rough-In | 7/6/2009 | 7/7/2009 | 7/7/2009 2:36:10 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Shawn Kelley. Ok to cover.
|
ELE09-01170
| Electrical Rough-In | 7/6/2009 | 7/7/2009 | 7/7/2009 1:43:08 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/6/2009 at 2:19:41 PM. Contact: ###-####. Ok to cover walls. No esc permit.
|
ELE09-01144
| Electrical Rough-In | 7/7/2009 | 7/7/2009 | 7/7/2009 1:08:26 PM | P | PASS |
|
|
Dave Phone #: ###-#### Ok to cover. Did a survey on a tear in outer insulation and a box needing secured better. Notifiied dave.No esc permit.
|
ELE09-01183
| Permanent Service | 7/6/2009 | 7/7/2009 | 7/7/2009 11:49:51 AM | A | DONE |
|
|
Existing service inspection so power can be restored to building - Call Lloyd 1/2 hour before inspection, I''ll meet you there. Phone #: ###-#### Internet InspectionRequest from: Lloyd Looney Told Lloyd that the 400 amp panel needed a UL appr. dead man cover or that he needed to replace it.
|
ELE09-01171
| Temporary Service | 7/6/2009 | 7/7/2009 | 7/7/2009 10:45:23 AM | A | PASS |
|
|
Call Brad if any questions. Phone #: ###-#### Internet Inspection Request from: Bill Hines.
|
ELE09-00914
| Final | 7/6/2009 | 7/7/2009 | 7/7/2009 9:42:58 AM | A | PASS |
|
|
Please call 10 or 15 minutes ahead so we can meet at job site. Phone #: ###-#### Internet Inspection Request from: mark morris. Ok final. No esc permit.
|
ELE07-03020
| Conference | 7/6/2009 | 7/7/2009 | 7/7/2009 9:02:22 AM | A | DONE |
|
|
Jay Parks ###-####//call 30 min prior to meet. Jay wants to put service underground. We talked about different ways to accomplish this.
|
ELE09-01188
| Temporary Service | 7/7/2009 | 7/7/2009 | 7/7/2009 12:00:00 AM | P | CANC |
|
|
contact: Bob Schroder Phone #: ###-#### Internet Inspection Request from: Julie Schroder
|