Inspections for the day of: Tuesday, July 7, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00396 Site Preparation7/7/20097/7/20097/8/2009 11:13:30 AM NR
ESC07-00167 Aging Inspection7/7/20097/7/20097/7/2009 3:27:54 PM DONE
ESC07-00167 DOC - Permit Finaled7/7/20097/7/20097/7/2009 3:27:40 PMPPASS
ESC09-00139 Site Preparation7/7/20097/7/20097/7/2009 12:57:15 PMPPASS
ESC09-00381 Site Preparation7/6/20097/7/20097/7/2009 10:51:00 AMAPASS
ESC09-00352 Conference7/7/20097/7/20097/7/2009 10:39:47 AMPDONE
Went over the scope of work. All issues have ben addressed and will be maintained in the process of work. Once a phase of work is complete it will be stabilized right at the finish of that particular phase.
ESC09-00352 Site Preparation7/7/20097/7/20097/7/2009 10:38:10 AM PASS
ESC09-00286 General Inspection7/7/20097/7/20097/7/2009 10:37:53 AMAPASS
All pumping within the Wallings Creek has ended. All water is being deverted into there North West Basin.