ELE09-02364
| ELE-Aging Inspection | 7/7/2010 | 7/7/2010 | 7/9/2010 6:27:25 AM | | DONE |
|
|
see doc expire
|
ELE10-01478
| Electrical Rough-In | 7/7/2010 | 7/7/2010 | 7/7/2010 3:32:32 PM | P | CANC |
|
|
trench has been dug deeper for conduit Inspection requested from web by: Shaun Kirkman Phone #: ###-#### contractor called and wants to reschedule after pump installed
|
ELE10-01124
| Final | 7/7/2010 | 7/7/2010 | 7/7/2010 3:31:11 PM | P | PASS |
|
|
Please call ###-#### - 20 mins. prior to arrival. Inspection requested from web by: John Edwards Phone #: ###-#### ok to final
|
ELE10-01509
| Electrical Rough-In | 7/7/2010 | 7/7/2010 | 7/7/2010 2:46:24 PM | P | FAIL |
|
|
Electrical rough for walls. Contact is Jay Sprik. Inspection requested from web by: Richard Montgomery Phone #: ###-#### called, left correction notice, NEC 300.14 at least 6' free conductor shall be provided where conductor emerges from cable, 110.26(F)(1) there shall be no foreign piping in dedicated equipment space
|
ELE10-01458
| Rough-In Permanent Service | 7/7/2010 | 7/7/2010 | 7/7/2010 1:32:29 PM | P | PASS |
|
|
neil Phone #: ###-#### ric ok, p/s u/g n ok
|
ELE10-01410
| Electrical Rough-In | 7/7/2010 | 7/7/2010 | 7/7/2010 12:20:34 PM | P | PASS |
|
|
gene - cover for floor heat Phone #: ###-#### ok to cover floor heat
|
ELE10-01282
| Final | 7/6/2010 | 7/7/2010 | 7/7/2010 10:37:18 AM | A | CANC |
|
|
Please call 20 min prior to arrival for access. Inspection requested from web by: John Edwards Phone #: ###-#### called, wrong job
|
ELE10-01282
| Electrical Rough-In | 7/6/2010 | 7/7/2010 | 7/7/2010 10:04:26 AM | A | PASS |
|
|
Need ok to cover new walls in kitchen and cover trench for hot tub. Inspection requested from web by: John Edwards Phone #: ###-#### corrections made, ric ok kitchen, u/g for hot tub ok
|
ELE10-01494
| Electrical Rough-In | 7/6/2010 | 7/7/2010 | 7/7/2010 9:25:03 AM | A | PASS |
|
|
jeff Phone #: ###-#### 3rd floor ri ok
|
ELE10-01222
| Final | 7/6/2010 | 7/7/2010 | 7/7/2010 8:35:26 AM | A | PASS |
|
|
Inspection requested from web by: David Bonner Phone #: ###-#### corrections made for addecco only, contractor must pull new electrical permit for balance of work, signed card
|
ELE10-01479
| Final | 7/6/2010 | 7/7/2010 | 7/7/2010 8:01:37 AM | A | PASS |
|
|
The key is inside the A/C disconnect in front of the building. Inspection requested from web by: Cyndi Dale Phone #: ###-#### called, ok to final
|
ELE09-01984
| DOC - Permit Expired | 7/7/2010 | 7/7/2010 | 7/7/2010 6:34:23 AM | A | PASS |
|
|
no activity
|
ELE09-01983
| DOC - Permit Expired | 7/7/2010 | 7/7/2010 | 7/7/2010 6:33:21 AM | A | PASS |
|
|
no activity
|
ELE09-01978
| DOC - Permit Expired | 7/7/2010 | 7/7/2010 | 7/7/2010 6:32:13 AM | A | PASS |
|
|
no activity
|
ELE09-01395
| DOC - Permit Expired | 7/7/2010 | 7/7/2010 | 7/7/2010 6:30:39 AM | A | PASS |
|
|
no activity
|
ELE09-02293
| ELE-Aging Inspection | 7/7/2010 | 7/7/2010 | 7/7/2010 6:24:55 AM | | DONE |
|
|
see doc expire
|
ELE09-02293
| DOC - Permit Expired | 7/7/2010 | 7/7/2010 | 7/7/2010 6:24:43 AM | A | PASS |
|
|
no activity
|
ELE08-02475
| ELE-Aging Inspection | 7/7/2010 | 7/7/2010 | 7/7/2010 6:22:24 AM | | DONE |
|
|
see doc expire
|
ELE08-02475
| DOC - Permit Expired | 7/7/2010 | 7/7/2010 | 7/7/2010 6:22:07 AM | A | PASS |
|
|
no activity
|
ELE08-02464
| ELE-Aging Inspection | 7/7/2010 | 7/7/2010 | 7/7/2010 6:20:48 AM | | DONE |
|
|
see doc expire
|
ELE08-02464
| DOC - Permit Expired | 7/7/2010 | 7/7/2010 | 7/7/2010 6:20:35 AM | A | PASS |
|
|
no activity
|