FIR10-00535
| FIR-Aging Inspection | 7/7/2011 | 7/7/2011 | 7/8/2011 4:37:08 PM | | PEND |
|
|
|
FIR10-00137
| INSP-Alarm Testing | 7/7/2011 | 7/7/2011 | 7/8/2011 4:23:55 PM | P | PART |
|
|
Completed elevator device testing, SD at nac's and FACP, reviewed changes and adjustments to date, discussed items remaining including AC power light at the panel, guards at gym appliances, signage at doors to the FACP, as-builts/map, and notification testing schedule.
|
FIR10-00583
| INSP-Sprinkler Rough-in/Hydro | 7/6/2011 | 7/7/2011 | 7/8/2011 4:20:26 PM | P | PART |
|
|
UG fire supply line hydrostatic test passed.
|
FIR11-00307
| INSP-Final Inspection | 7/7/2011 | 7/7/2011 | 7/7/2011 3:08:50 PM | P | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR11-00307
| INSP-Sprinkler Rough-in | 7/7/2011 | 7/7/2011 | 7/7/2011 3:07:54 PM | P | PART |
|
|
Overhead fire sprinkler system modifications per the scope of work passed rough-in inspection.
|
BLD11-00693
| FIRE-Sprinkler Rough-in | 7/7/2011 | 7/7/2011 | 7/7/2011 3:06:38 PM | P | PART |
|
|
Preliminary overhead fire sprinkler inspection at the life test room 1 completed.
|
BLD09-00510
| FIRE-Final Inspection | 7/6/2011 | 7/7/2011 | 7/7/2011 3:04:48 PM | A | PASS |
|
|
Fire life safety finaled.
|
BLD11-00949
| FIRE-Conference | 7/6/2011 | 7/7/2011 | 7/7/2011 3:02:34 PM | A | DONE |
|
|
On site conference with contractor regarding code requirements per 1997 UFC sec. 1003.3.1 (2) sprinkler monitoring and alarms.
|
FIR11-00266
| INSP-Sprinkler Rough-in | 7/6/2011 | 7/7/2011 | 7/7/2011 2:57:05 PM | A | PART |
|
|
Overhead work approved for cover with the exception of one overspaced hanger at an armover in the kitchen area- See plans for marked location.
|
FIR11-00025
| INSP-Final Inspection | 7/6/2011 | 7/7/2011 | 7/7/2011 2:54:22 PM | A | PASS |
|
|
Fire sprinkler permit finaled.
|