FIR11-00095
| INSP-Sprinkler Rough-in | 7/7/2011 | 7/7/2011 | 7/7/2011 3:58:14 PM | A | PASS |
|
|
Inspection was for the first floor of the office area. Previous items on the correction notice have been addressed except for the missing hanger. This rough-in is for the system piping only. The arm overs and pendant heads have not been installed and will need to be verified with a separate inspection. Revised hydraulic calculations and plans need to be submittted to Tim Frost for verification of the piping changes noted at the first rough-in inspection.
|
FIR10-00595
| INSP-Sprinkler Rough-in/Hydro | 7/6/2011 | 7/7/2011 | 7/7/2011 3:55:37 PM | A | CANC |
|
|
This permit called in by mistake by John
|
BLD11-01329
| FIRE-Final Inspection | 7/5/2011 | 7/7/2011 | 7/7/2011 12:06:01 PM | A | PASS |
|
|
life safety passed
|
BLD11-00495
| FIRE-Final Inspection | 7/6/2011 | 7/7/2011 | 7/7/2011 10:44:23 AM | A | PASS |
|
|
life safety passed
|
FIR11-00318
| INSP-Final Inspection | 7/6/2011 | 7/7/2011 | 7/7/2011 10:43:05 AM | P | PASS |
|
|
permit finaled
|
BLD11-00692
| FIRE-Final Inspection | 7/7/2011 | 7/7/2011 | 7/7/2011 9:39:38 AM | P | PASS |
|
|
life safety passed
|
BLD11-01089
| FIRE-Final Inspection | 7/5/2011 | 7/7/2011 | 7/7/2011 9:24:43 AM | A | PART |
|
|
A 30 day temporary occupancy for life safety was given with Gordan's permission until the fire alarm is addressed.
|