ESC11-00265
| Site Preparation | 6/30/2011 | 6/30/2011 | | | |
|
|
|
BLD11-00406
| BLD-Framing/Rough-in | 7/7/2011 | 7/7/2011 | 7/8/2011 9:37:12 AM | P | PART |
|
|
shane Phone #: ###-####. Interior wood framed walls. Needs to foam seal top plates. Also clarified with Tim woodard that rated corridors were not required due to installation of quick response heads on fire sprinklers. Did note to to shane with jayo const. that architect needs to resubmit breakroom pland s for approval.
|
BLD11-01162
| BLD-Framing/Rough-in | 7/7/2011 | 7/7/2011 | 7/7/2011 3:52:20 PM | P | PASS |
|
|
jr Phone #: ###-####. Interior steel stud framed walls for restroom.
|
ESC10-00859
| BMP Violation | 7/6/2011 | 7/7/2011 | 7/7/2011 3:32:39 PM | P | PASS |
|
|
|
BLD10-02669
| BLD-Foundation | 7/6/2011 | 7/7/2011 | 7/7/2011 3:32:27 PM | P | PASS |
|
|
Shane Phone #: ###-####
|
MIS11-00080
| MIS-Aging Inspection | 7/7/2011 | 7/7/2011 | 7/7/2011 3:17:54 PM | | PASS |
|
|
|
BLD11-00872
| BLD-Framing/Rough-in | 7/7/2011 | 7/7/2011 | 7/7/2011 3:09:41 PM | P | NR |
|
|
josh Phone #: ###-####. Needs to complete air seal package prior to framing inspection.
|
ESC11-00245
| General Inspection | 7/7/2011 | 7/7/2011 | 7/7/2011 3:09:09 PM | P | PART |
|
|
Needs to sweep all silts from har surfaces. Correction notice was posted.
|
ESC11-00438
| Random Inspection | 7/6/2011 | 7/7/2011 | 7/7/2011 2:22:43 PM | P | PASS |
|
|
|
BLD11-01161
| BLD-Foundation | 7/5/2011 | 7/7/2011 | 7/7/2011 2:22:30 PM | P | PASS |
|
|
Mark Phone #: ###-####
|
BLD11-00495
| BLD-Final | 7/7/2011 | 7/7/2011 | 7/7/2011 1:48:05 PM | P | PASS |
|
|
Ok for perm occ.,
|
BLD11-00495
| BLD-Final | 7/6/2011 | 7/7/2011 | 7/7/2011 10:54:59 AM | A | NR |
|
|
fire alarm and life safety has also been called in for am inspection letter of compliance from special inspector is complete Phone #: ###-#### >> Inspection requested via web by Mike Shain
|
GCB11-00022
| GCB-Fndatn/slab ins/fld vent | 7/6/2011 | 7/7/2011 | 7/7/2011 10:54:38 AM | A | PART |
|
|
Foundation (Grout)Rob @ ###-####AM Inspection - 11 A.M. if possible. Cmu columns, top out. Work in progress. Special inspector on site.
|
GCB11-00046
| GCB-Footing | 7/6/2011 | 7/7/2011 | 7/7/2011 9:33:02 AM | A | PART |
|
|
FootingsRyan @ ###-####Call in Advance. work in progress.
|