BLD13-02693
| FIRE-Conference | 7/7/2014 | 7/7/2014 | 7/7/2014 5:12:42 PM | P | DONE |
|
|
Regarding project finals.
|
FIR14-00327
| INSP-Sprinkler Rough-in | 7/7/2014 | 7/7/2014 | 7/7/2014 4:02:31 PM | P | PART |
|
|
Conference room and open office area as marked and dated on plans approved for cover.
|
FIR13-00440
| INSP-Sprinkler Rough-in | 7/7/2014 | 7/7/2014 | 7/7/2014 4:01:02 PM | P | PART |
|
|
Completed walkthrough of 2nd floor core and common areas including restrooms for fire sprinkler finishes. Verified added coverage at 2" CPVC main.
|
FIR13-00440
| INSP-Final Inspection | 7/3/2014 | 7/7/2014 | 7/7/2014 2:18:45 PM | A | PART |
|
|
Completed walkthrough for fire sprinkler finishes at the 1st floor core, lobby, reception, and common areas. Missing escutcheon replaced while on site, verified outside waterflow bell. Need to provide coverage at a closet or meet exceptions per NFPA 13.
|
FIR14-00121
| INSP-Final Inspection | 7/3/2014 | 7/7/2014 | 7/7/2014 2:14:54 PM | A | PART |
|
|
Verified added coverage at the exposed 2" CPVC main in the shell area.
|
FIR13-00409
| INSP-Final Inspection | 7/3/2014 | 7/7/2014 | 7/7/2014 2:12:41 PM | A | PART |
|
|
Notification at the kitchen and bakery areas 1st floor tested satisfactory.
|
FIR14-00269
| INSP-Sprinkler Rough-in | 7/3/2014 | 7/7/2014 | 7/7/2014 2:11:10 PM | A | PART |
|
|
Inspection for overhead cover at an office, two restrooms, vestibule, and seven classrooms as marked and dated on approved plans okayed for drop ceiling cover. Need to add upright protection at one pocket above the NW corner of the 5th grade classroom, provide intermediate temp head at the office due to proximity to an HVAC diffuser.
|
BLD14-00858
| FIRE-Final Inspection | 7/3/2014 | 7/7/2014 | 7/7/2014 2:07:02 PM | A | PASS |
|
|
Fire life safety inspection passed. Contractor to provide single action hardware at the new restroom prior to structural final.
|