Inspections for the day of: Monday, July 7, 2014.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS12-00027 MIS-Aging Inspection7/7/20147/7/20147/8/2014 4:32:49 PM PASS
BLD14-00361 BLD-Wall cover7/7/20147/7/20147/7/2014 3:36:17 PMPPASS
First layer inspected on Thursday. It passed by Mike Jordan
but forgot to submit for inspection online, so submitting for inspection
now on it. Prefer later in afternoon for inspection. Phone #: ###-#### Inspection requested via web by robert campbell. !st. and 2nd layers ok, party wall ok.
BLD14-00245 BLD-Framing/Rough-in7/7/20147/7/20147/7/2014 3:27:17 PMPPASS
Aaron-please go as close to 10 as possible Phone #: ###-####
BLD14-00245 BLD-Energy code compliance7/7/20147/7/20147/7/2014 3:27:07 PMPPASS
Aaron-please go as close to 10 as possible Phone #: ###-####
BLD14-01809 BLD-Conference7/7/20147/7/20147/7/2014 3:06:17 PMPDONE
Herb Phone #: ###-####
BLD14-00204 BLD-Foundation7/7/20147/7/20147/7/2014 3:05:57 PMPCANC
Ashely-Foundation energy Phone #: ###-####. rigid insulation, interior side of stemwall under slab on grade.
BLD14-01854 BLD-Final7/7/20147/7/20147/7/2014 2:05:32 PMPDONE
Phone #: ###-#### Inspection requested via web by David Arnold
BLD14-01854 DOC - Permit Finaled7/7/20147/7/20147/7/2014 2:05:18 PMPPASS
All work appeared to be done in accordance with locla codes and ordinances.
GCB14-00050 GCB-Final7/3/20147/7/20147/7/2014 1:23:07 PMPPASS
patio cover west side of house
BLD14-00205 BLD-Foundation7/3/20147/7/20147/7/2014 11:39:55 AMAPASS
Manual Phone #: ###-####
BLD14-00172 BLD-Final7/2/20147/7/20147/7/2014 9:33:08 AMAPART
Frank Phone #: ###-####. Ok for temp occ. Main doors were wrong size and are using temp. doors until perm. doors are installed.
BLD14-01676 BLD-Final7/2/20147/7/20147/7/2014 9:32:08 AMAPASS
Frank Phone #: ###-####
BLD14-01676 DOC - Permit Finaled7/7/20147/7/20147/7/2014 9:31:50 AMPPASS
Special inspection s completed, reviewed report.