ESC14-00155
| Random Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 4:23:05 PM | P | PART |
|
|
Observed a significant amount of dust from demo project. Crew had water truck on site but was not applying any water while the tractor was crushing materials creating dust.
Requested that foreman increase water usage before and during crushing stuff. He agreed and direceted one of his employees to the hose.
|
ESC13-00755
| Complaint Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 4:16:28 PM | P | PART |
|
|
Complaint received regarding unreasonable amount of dust blowing off the Terraces site into trailer park north of Warm Springs.
Inspection observations: 1. Dust crossing Warm Springs was visible all the way from Lucky 13 (Eckart & Warm Springs) 2. Water truck on site, but was not being used at time of inspection.
Verbal Warning issued to RP Preston Ellingford to increase water truck use or add an additional water truck to site. It may also be good to put a medium term dust suppresant or polymer on the main construction road. He stated the main issue is that the area between hospital facilities and the Greenbelt is being backfilled at the moment and the vehicle movement and dumping of dirt make dust control difficult.
|
ESC13-00979
| Site Preparation | 7/7/2014 | 7/7/2014 | 7/7/2014 2:49:36 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit posted. Tripplett Ranch townhome BMPs installed. Parcel is in between 2 existing homes under construction. Washout is lined and has 95% capacity remaining. Approved for excavation.
|
ESC13-00522
| General Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 2:46:21 PM | | PART |
|
|
Frame is up. No trackout or ESC violations. There is no trashbox so pile needs to be picked up to prevent wind carrying away litter.
|
ESC14-00313
| Random Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 2:30:16 PM | P | PASS |
|
|
No trackout to Parkcenter observed. No dust issues at time of inspection. Site has valid permit and BMPs installed.
|
ESC13-01323
| Complaint Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 12:10:51 PM | P | PEND |
|
|
Complaint about stockpiling without valid permit received via email.
The stockpile is owned by parcel owner and will be used for the upcoming Cantabria project to be start in late August or early September. No more large loads of dirt are scheduled to be added to existing amount.
Placement of stockpile is below grade of Overland and Cloverdale and over 50 ft from the canal, which also has an access road buffer and vegetation along bank.
BMPs per ESC plan will be setup prior to any construction activity with a Site Prep inspection to be conducted. Discussed project with Darin Thornton from Anderson Construction ###-####
|
ESC13-00345
| General Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 11:35:00 AM | | PASS |
|
|
Warehouse is erected and work on interior and some areas of exterior are in progress. No corrections at this time.
|
ESC13-00892
| Random Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 11:34:09 AM | P | PASS |
|
|
Site development is near completion at Aviation Specialties. New curbs and sidewalks are currently being installed so there is some minor trackout onto Aeronica St. No discharge or other violations observed. Just needs standard house-cleaning. Vertical construction covered under ESC13-00345.
|
ESC14-00206
| Random Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 11:03:33 AM | P | PASS |
|
|
New Sunnyridge phase is in progress. No trackout or dust issues at time of inspection and minimal activity. Permit and SWPPP are on site and BMPs are installed. No corrections at this time.
Note: Eaglewood Homes RP informed me that a street sweeper will be coming this week for the existing Sunnyridge phases (per developer Brad M.)
|
ESC13-00501
| General Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 11:01:03 AM | | PASS |
|
|
ESC conditions satified and permit finaled. BLD permit is still open.
|
ESC13-00501
| DOC - Permit Finaled | 7/7/2014 | 7/7/2014 | 7/7/2014 11:00:24 AM | P | PASS |
|
|
Poolhouse structure is complete and the pool has been filled with water. Landscaping already installed and disturbed areas stabilized. No violations. No further ESC inspections necessary.
|
ESC14-00419
| Random Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 10:57:40 AM | P | PART |
|
|
WIP. Permits for new Hayden homes projects are posted. Framers need to pick up wood scaps and sweep at end of day due to lack of containment and some sediment accumulation in gutter.
|
ESC14-00451
| Site Preparation | 7/1/2014 | 7/7/2014 | 7/7/2014 10:41:01 AM | A | PASS |
|
|
Jason from Syman requested site prep ####-####
DIs on Federal Way and OrePac parking lot have filter bag protection. Wattle protects end of sediment trap/drainage ditch on southeast end of property. Permit is to be picked up within next few days and construction commencing at that time. Approved.
|
ESC12-00447
| Aging Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 10:01:09 AM | | PASS |
|
|
Abode sub development is complete. Will keep open to monitor condition of empty parcels. Only a few left.
|
ESC12-00906
| Aging Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 9:45:35 AM | | PASS |
|
|
ESC finaled; BLD open but no activity
|
ESC12-00906
| DOC - Permit Finaled | 7/7/2014 | 7/7/2014 | 7/7/2014 9:45:10 AM | P | PASS |
|
|
Permit expired. No construction or disturbed earth. No further ESC inspections.
|
ESC13-00492
| General Inspection | 7/7/2014 | 7/7/2014 | 7/7/2014 8:04:56 AM | | PASS |
|
|
Finaled.
|
ESC13-00492
| DOC - Permit Finaled | 7/7/2014 | 7/7/2014 | 7/7/2014 8:04:43 AM | P | PASS |
|
|
Union Square phase II is complete, landscaped, and occupied. No further construction activity. ESC conditions satisfied.
|
ESC13-01107
| DOC - Permit Finaled | 7/7/2014 | 7/7/2014 | 7/7/2014 7:56:57 AM | P | PASS |
|
|
BLD permit finaled. ESC conditions satisfied. No more inspections required.
|