BLD15-01037
| BLD-Wall Bracing | 7/7/2015 | 7/7/2015 | 7/7/2015 4:14:51 PM | P | PASS |
|
|
shear wall Phone #: ###-####
|
BLD15-01146
| BLD-Energy code compliance | 7/7/2015 | 7/7/2015 | 7/7/2015 4:14:22 PM | P | PASS |
|
|
Colby Phone #: ###-####
|
BLD13-01668
| BLD-Foundation | 7/6/2015 | 7/7/2015 | 7/7/2015 3:32:33 PM | P | PASS |
|
|
Martin Phone #: ###-####
|
BLD15-01835
| BLD-Footing | 7/6/2015 | 7/7/2015 | 7/7/2015 3:32:16 PM | P | PASS |
|
|
Pat Phone #: ###-####
|
BLD15-00861
| BLD-Final | 7/7/2015 | 7/7/2015 | 7/7/2015 3:31:50 PM | P | NR |
|
|
Gabe Phone #: ###-####; would like call ahead need fire insp.
|
BLD15-01832
| BLD-Framing/Rough-in | 7/6/2015 | 7/7/2015 | 7/7/2015 1:26:44 PM | A | FAIL |
|
|
Perry Phone #: ###-#### 2 mlb 1.75 x 14 spec. on plan// top chord bracing required.
|
BLD13-00184
| BLD-Energy code compliance | 7/6/2015 | 7/7/2015 | 7/7/2015 12:34:50 PM | A | PASS |
|
|
3rd floor; John Phone #: ###-####
|
BLD13-00184
| BLD-Framing/Rough-in | 7/6/2015 | 7/7/2015 | 7/7/2015 12:34:04 PM | A | PASS |
|
|
3rd floor; John Phone #: ###-####
|
BLD13-00187
| BLD-Ceiling Grid Inspection | 7/6/2015 | 7/7/2015 | 7/7/2015 12:32:48 PM | A | PASS |
|
|
Gary// 4th floor, hallway F Phone #: ###-####
|
BLD15-01577
| BLD-Footing | 7/6/2015 | 7/7/2015 | 7/7/2015 11:26:42 AM | A | NR |
|
|
Derek Phone #: ###-####
|
BLD15-01933
| BLD-Framing/Rough-in | 7/6/2015 | 7/7/2015 | 7/7/2015 8:51:28 AM | A | PART |
|
|
TJ Phone #: ###-#### frame ok need ele insp.
|