FIR13-00167
| INSP-Final Inspection | 7/2/2015 | 7/7/2015 | 7/7/2015 1:56:20 PM | P | PASS |
|
|
Flush test of the FS U/G supply line from the 11th street connection to the pump header (pump was bypassed). Flushed clear after 2 attempts. OK to connect this supply line to the pump suction feed main.
|
FIR13-00167
| INSP-Sprinkler Rough-in/Hydro | 7/7/2015 | 7/7/2015 | 7/7/2015 11:39:16 AM | P | PASS |
|
|
Completion of 24 hour air test of four (4) dry pipe valves located in the U/G parking garage. All PASSED.
|
FIR14-00815
| INSP-Sprinkler Rough-in | 7/6/2015 | 7/7/2015 | 7/7/2015 10:35:07 AM | A | PART |
|
|
Rough to cover inspection for the corridors on floors 2 and 3, in section 3 of the building. OK to cover pipe.
|