ELE20-01449
| Final | 7/7/2020 | 7/7/2020 | 7/7/2020 1:13:59 PM | P | PASS |
|
|
Call for access Phone #: ###-#### Inspection requested via web by John VanZandt final ok
|
ELE20-01450
| Final | 7/7/2020 | 7/7/2020 | 7/7/2020 1:13:27 PM | P | PASS |
|
|
Call for access Phone #: ###-#### Inspection requested via web by John VanZandt final ok
|
ELE20-01437
| Electrical Rough-In | 7/6/2020 | 7/7/2020 | 7/7/2020 11:32:35 AM | A | PASS |
|
|
screened // Dan Phone #: ###-#### walls only as marked on contractor print ok to cover
|
ELE20-02301
| Electrical Rough-In | 7/6/2020 | 7/7/2020 | 7/7/2020 11:30:09 AM | A | PASS |
|
|
Partial Rough In Inspection of the kitchen/dining room Corbin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Pantry, Dining and kitchen plug ok to cover
|
ELE20-02302
| Final | 7/6/2020 | 7/7/2020 | 7/7/2020 9:56:35 AM | A | PASS |
|
|
Call for pictures. Phone #: ###-#### Inspection requested via web by Garrett Collins RV recep final ok
|
ELE20-02302
| Final | 7/7/2020 | 7/7/2020 | 7/7/2020 9:07:23 AM | P | PASS |
|
|
Call for pictures. Phone #: ###-#### Inspection requested via web by Garrett Collins RV recep below panel rough in ok
|
ELE20-02151
| Electrical Rough-In | 7/5/2020 | 7/7/2020 | 7/7/2020 9:04:53 AM | A | FAIL |
|
|
Units 444 and 446 ONLY are ready for rough/remodel inspection Phone #: ###-#### Inspection requested via web by Ben Grundhauser 210.11C2 and C3. 20A laundry circuit shall have no other outlets, 20A Bath circuit shall have no other outlets. ( Seperate washer and Bath circuit, add circuit for Bath vanity.) At final Bed shall be AFCI protected, J-box in closet of 444 and 446 shall be blanked with no device installed as it is part of the kitchen/ dining room circuit.
|
ELE19-01403
| Electrical Rough-In | 7/6/2020 | 7/7/2020 | 7/7/2020 8:33:26 AM | A | PASS |
|
|
Rough in inspection lighting and camera boxes and associated raceways for 6-4 concrete pour Phone #: ###-#### Inspection requested via web by John Mittleider Pour 6-4 ok to cover
|