MEC96-01260
| INSP - Gas pressure test | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | | PASS |
|
|
/ / 350 - P/T OK #28206
|
MEC96-01285
| INSP - Final | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | PASS |
|
|
07/08/96 350 - REINSPECT/ GARAGE DOOR WILL BE UNLOCKED MECH. FINAL OK CHECK BACKDRAFT DAMPER ON HOOD ON HOUSE FINAL
|
MEC96-01285
| INSP - Final | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | PASS |
|
|
07/08/96 350 - REINSPECT/ GARAGE DOOR WILL BE UNLOCKED MECH. FINAL OK CHECK BACKDRAFT DAMPER ON HOOD ON HOUSE FINAL
|
MEC96-01553
| INSP - Final | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | PASS |
|
|
07/08/96 350 - FINAL OK
|
MEC96-01553
| INSP - Final | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | PASS |
|
|
07/08/96 350 - FINAL OK
|
MEC96-01892
| INSP - Gas pressure test | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | PASS |
|
|
07/08/96 350 - P/T OK FOR GAS RANGE #28207 FINAL
|
MEC96-01906
| INSP - Rough-in & Gas Pressure | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | PASS |
|
|
07/08/96 350 - BASIC FOUR AND GAS LOG. R/I OK P/T OK #28244 CHECK ON FRAME FOR CORRECTIONS ON HVAC, FLATTEN STR R.A. AND FOIL TAPE RANGE EXHAUST
|
BLD96-00891
| INSP - Energy code compliance | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | CANC |
|
|
07/08/96 350 - THIS IS GOING TO BE DONE BY PERRY P.
|
BLD96-01001
| INSP - Framing/Rough-in | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | PASS |
|
|
07/08/96 350 - SHEER NAILING OK, OK TO COVER WITH GREEN BOARD INSULATION
|
BLD96-01002
| INSP - Framing/Rough-in | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | PASS |
|
|
07/08/96 350 - SHEER NAILING OK, OK TO COVER WITH GREEN BOARD INSULATION
|
BLD96-01117
| INSP - Energy code compliance | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | PASS |
|
|
07/08/96 350 - INSULATION OK, OK TO COVER
|
BLD96-01734
| INSP - Framing/Rough-in | 7/8/1996 | 7/8/1996 | 7/8/1996 12:00:00 AM | P | PASS |
|
|
07/08/96 350 - FRAMING OK FOR PATIO COVER
|