Inspections for the day of: Monday, July 8, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01619 BLD-Framing/Rough-in7/6/20027/8/20027/8/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/06/2002 at 16:35:13. Contact: ###-####. need others to do r/i. 7/8/2002 9:53:16 AM
MEC02-01644 Final7/1/20027/8/20027/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/01/2002 at 13:29:06. Contact: ###-####.
BLD02-01594 BLD-Framing/Rough-in7/5/20027/8/20027/8/2002 12:00:00 AMPPASS
ED VOICE PAGER ###-####
BLD02-01402 BLD-Final7/8/20027/8/20027/8/2002 12:00:00 AMPNR
fn- ###-####- mike needs ele and crawll space access. 7/8/2002 3:17:33 PM
BLD02-01494 BLD-Energy code compliance7/8/20027/8/20027/8/2002 12:00:00 AMPPASS
garrett- ###-#### insulation
BLD01-03127 BLD-Final7/8/20027/8/20027/8/2002 12:00:00 AMPNR
###-#### ###-####need sign offs. 7/8/2002 4:00:13 PM
BLD02-00567 BLD-Footing7/8/20027/8/20027/8/2002 12:00:00 AMPPASS
VERNE ###-####ft and rebar ok 7/8/2002 3:37:30 PM
BLD02-00251 BLD-Framing/Rough-in7/8/20027/8/20027/8/2002 12:00:00 AMPFAIL
SHEER NAIL PLANS ON 2ND FLOOR RONALD ###-#### not per plan/ justify headers/chennals must verify insulation prior to exterior sheating. 7/8/2002 2:44:35 PM
BLD02-00795 BLD-Footing7/8/20027/8/20027/8/2002 12:00:00 AMPNR
chris ###-####. 7/8/2002 11:16:56 AM need letter from engineer of site inspection to verify soil and footing configuration. 7/8/2002 4:54:31 PM
BLD02-01190 BLD-Footing7/8/20027/8/20027/8/2002 12:00:00 AMPPASS
JERRY- ###-#### FT ft ok 7/8/2002 3:07:55 PM