BLD02-01148
| BLD-Framing/Rough-in | 7/3/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | A | FAIL |
|
|
STEVE ###-#### // CELL # ###-####c/n posted also needs electrical and mechanical approved. 7/8/2002 5:22:21 PM
|
BLD02-00795
| BLD-Footing | 7/3/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | A | CANC |
|
|
CHRIS ###-####
|
BLD02-01209
| BLD-Framing/Rough-in | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | PASS |
|
|
todd ###-####
|
BLD02-01215
| BLD-Framing/Rough-in | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | FAIL |
|
|
ROD ###-#### FINAL FRAMING.c/n posted. 7/8/2002 5:23:08 PM
|
BLD02-00018
| BLD-Framing/Rough-in | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | NR |
|
|
###-####needs electrical and plumbing. 7/8/2002 5:22:44 PM
|
BLD02-01543
| BLD-Framing/Rough-in | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | FAIL |
|
|
GREG ###-####block and nail shear. 7/8/2002 5:28:46 PM
|
MEC02-01698
| Rough-in | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | NR |
|
|
###-####. gas not pressurized and r-i not compltete. 7/8/2002 5:24:36 PM
|
BLD02-01316
| BLD-Framing/Rough-in | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | FAIL |
|
|
FR JOHN ###-#### c/n posted. 7/8/2002 5:24:49 PM
|
BLD02-01313
| BLD-Framing/Rough-in | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | FAIL |
|
|
FR JOHN ###-#### c/n posted. 7/8/2002 5:23:14 PM
|
MEC02-01786
| Pressure Test | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 11:06:38. Contact: ###-####.
|