FIR02-00119
| INSP-Sprinkler Rough-in/Hydro | 7/2/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/02/2002 at 10:30:28. Contact: ###-####. hydro okay on wet and dry 7/8/2002 3:20:21 PM
|
FIR02-00130
| INSP-Sprinkler Rough-in/Hydro | 7/3/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/03/2002 at 14:10:20. Contact: ###-####.cancel per chris
|
FIR02-00130
| INSP-Sprinkler Rough-in/Hydro | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 10:04:03. Contact: ###-####. all systems hydro okay 7/8/2002 4:51:04 PM
|
BLD02-00054
| FIRE-Final Inspection | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | PASS |
|
|
JERRY ###-#### handrail and guardrail not installed and will have installed for structural 7/8/2002 3:23:19 PM
|
FIR02-00119
| INSP-Sprinkler Rough-in/Hydro | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 409 On 7/8/2002 3:19:53 PM underground hudro okay
|
FIR02-00156
| INSP-Sprinkler Rough-in/Hydro | 7/8/2002 | 7/8/2002 | 7/8/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 409 On 7/8/2002 3:21:57 PM hydro on wet and dry okay
|