Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS03-00130 FIR-Final7/2/20037/8/20037/8/2003 12:00:00 AMAFAIL
kevin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need exit signs in basement as two exits required; need sprinkler head under stairs or seal off; need emergency lights for main floor; need penetration firestopped in corridor 7/8/2003 10:52:14 AM
BLD03-01106 FIRE-Final Inspection7/2/20037/8/20037/8/2003 12:00:00 AMAFAIL
wendy; Phone #: ###-#### Internet Inspection Request from: Annette Moore need approved plans; repair ceiling at new plumbing lines 7/8/2003 10:52:56 AM
BLD03-00416 FIRE-Final Inspection7/8/20037/8/20037/8/2003 12:00:00 AMAPASS
Cathy has the sign off card - please let her know when approved! okay for occupancy 7/8/2003 9:39:29 AM
FIR03-00346 INSP-Conference7/8/20037/8/20037/8/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 7/8/2003 at 8:38:55 AM. Contact: ###-####. not installed per plans and will resubmit with overhead submittals; PIV to be relocated to parking area by vault; UG relocated also due to electrical vault; will need tracer wire and pipe for monitoring PIV 7/8/2003 4:29:08 PM
BLD02-00090 FIRE-Final Inspection7/8/20037/8/20037/8/2003 12:00:00 AMPFAIL
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need closures on doors to corridor; door to lobby locks and is required exit 7/8/2003 4:26:18 PM
FIR03-00088 INSP-Sprinkler Rough-in/Hydro7/7/20037/8/20037/8/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 7/7/2003 at 2:34:48 PM. Contact: ###-####. need resubmittals for pipe changes and standpipe changes; need listing for fire stopping standpipe through floor/ceiling assembly; EQ needed; need heat to maintain 40 degrees in north rooms where main enters building through vestibule and bike room 7/8/2003 4:25:01 PM
FIR03-00067 INSP-Sprinkler Rough-in/Hydro7/7/20037/8/20037/8/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 7/7/2003 at 2:36:20 PM. Contact: ###-####. resubmittals needed for pipe changes and relocation of inspectors tests; may put systems over 750 gallons; Scheduled by a contractor via Hello! on 7/7/2003 at 2:34:48 PM. Contact: ###-####. need resubmittals for pipe changes and standpipe changes; need listing for fire stopping standpipe through floor/ceiling assembly; EQ needed; need heat to maintain 40 degrees in north rooms where main enters building through vestibule and bike room 7/8/2003 4:25:20 PM