BLD03-02903
| BLD-Aging Inspection | 7/8/2004 | 7/8/2004 | 7/8/2004 12:00:00 AM | | CANC |
|
|
wip 7/8/2004 11:12:38 AM
|
BLD04-01337
| BLD-Foundation | 7/7/2004 | 7/8/2004 | 7/8/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/7/2004 at 7:21:16 AM. Contact: ###-####.
|
BLD04-01356
| BLD-Conference | 7/7/2004 | 7/8/2004 | 7/8/2004 12:00:00 AM | A | DONE |
|
|
pre construction conference 7/8/2004 11:07:19 AM
|
BLD04-00974
| BLD-Framing/Rough-in | 7/7/2004 | 7/8/2004 | 7/8/2004 12:00:00 AM | A | FAIL |
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
c/n posted on front window 7/8/2004 10:00:36 AM
|
BLD04-01123
| BLD-Framing/Rough-in | 7/7/2004 | 7/8/2004 | 7/8/2004 12:00:00 AM | A | PART |
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes previous correction to install new footing and pony wall ok. Need insulation inspection. 7/8/2004 10:17:50 AM
|
MEC04-00644
| Pressure Test | 7/8/2004 | 7/8/2004 | 7/8/2004 12:00:00 AM | P | PASS |
|
|
please inspect gas line in trench to patio location; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
Ok gas line from basement to stubs at grade only. 7/8/2004 3:05:41 PM
|
MEC04-01654
| Rough-in | 7/8/2004 | 7/8/2004 | 7/8/2004 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
Need to provide dryer installation instruction stating that current installation is acceptable. Current installation does not meet the IRC requirements. 7/8/2004 2:46:42 PM
|
MEC04-01654
| Pressure Test | 7/8/2004 | 7/8/2004 | 7/8/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
BLD04-00711
| BLD-Framing/Rough-in | 7/8/2004 | 7/8/2004 | 7/8/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/8/2004 at 11:28:37 AM. Contact: ###-####. Energy inspection ok. 7/8/2004 2:47:08 PM
|
BLD03-02083
| BLD-Framing/Rough-in | 7/8/2004 | 7/8/2004 | 7/8/2004 12:00:00 AM | P | PART |
|
|
Ok new header at stairs to get 6'8" clearance. Told owner to install new 2x8 joist to attach to existing joist.
|