FIR05-00345
| INSP-Sprinkler Rough-in/Hydro | 7/7/2005 | 7/8/2005 | 7/8/2005 4:24:06 PM | P | PART |
|
|
Rough-in is satisfactory, final pending ceiling tile and escutcheons.
|
FIR05-00045
| INSP-Final Inspection | 7/8/2005 | 7/8/2005 | 7/8/2005 3:19:36 PM | P | PART |
|
|
Need ceiling tile installed at head locations and escutcheons on prior to final, provide NFPA 25, provide signs for auxillary drains.
|
FIR05-00372
| INSP-Sprinkler Rough-in/Hydro | 7/8/2005 | 7/8/2005 | 7/8/2005 1:29:57 PM | P | PART |
|
|
Rough-in at theatres 1,2,3,4,5,6,7 are good for cover, improper branch line hanger in theatre 1 repaired while on site. EQ 4 way bracing in theatre 2 and 6 to be amended so lateral and longitudinal connections at main are closer together. Proper head spacing to be verified when heads are installed in tile at final locations.
|
BLD05-01107
| FIRE-Conference | 7/7/2005 | 7/8/2005 | 7/8/2005 11:50:21 AM | A | DONE |
|
|
On site discussion with Chris regarding door hardware requirements, fire ext. placement, building addressing, type 2 hood, occ. load sign, and emergency light testing.
|
BLD05-00669
| FIRE-Final Inspection | 7/7/2005 | 7/8/2005 | 7/8/2005 11:45:18 AM | A | PART |
|
|
Fire life safety is satisfactory for the basement portion of this permit. The entirely separate 1st floor office and mezzanine are not completed at this time.
|
FIR05-00344
| INSP-Sprinkler Rough-in/Hydro | 7/8/2005 | 7/8/2005 | 7/8/2005 10:09:14 AM | P | CANC |
|
|
Contact Matt. R-in and Hydro.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|