Inspections for the day of: Friday, July 8, 2005.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00345 INSP-Sprinkler Rough-in/Hydro7/7/20057/8/20057/8/2005 4:24:06 PMPPART
Rough-in is satisfactory, final pending ceiling tile and escutcheons.
FIR05-00045 INSP-Final Inspection7/8/20057/8/20057/8/2005 3:19:36 PMPPART
Need ceiling tile installed at head locations and escutcheons on prior to final, provide NFPA 25, provide signs for auxillary drains.
FIR05-00372 INSP-Sprinkler Rough-in/Hydro7/8/20057/8/20057/8/2005 1:29:57 PMPPART
Rough-in at theatres 1,2,3,4,5,6,7 are good for cover, improper branch line hanger in theatre 1 repaired while on site. EQ 4 way bracing in theatre 2 and 6 to be amended so lateral and longitudinal connections at main are closer together. Proper head spacing to be verified when heads are installed in tile at final locations.
BLD05-01107 FIRE-Conference7/7/20057/8/20057/8/2005 11:50:21 AMADONE
On site discussion with Chris regarding door hardware requirements, fire ext. placement, building addressing, type 2 hood, occ. load sign, and emergency light testing.
BLD05-00669 FIRE-Final Inspection7/7/20057/8/20057/8/2005 11:45:18 AMAPART
Fire life safety is satisfactory for the basement portion of this permit. The entirely separate 1st floor office and mezzanine are not completed at this time.
FIR05-00344 INSP-Sprinkler Rough-in/Hydro7/8/20057/8/20057/8/2005 10:09:14 AMPCANC
Contact Matt. R-in and Hydro.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley