Inspections for the day of: Friday, July 8, 2005.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00258 INSP-Final Inspection7/7/20057/8/20057/8/2005 4:27:43 PMPCANC
COCNTACT JIM; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
FIR05-00144 INSP-Final Inspection7/7/20057/8/20057/8/2005 3:57:41 PMPPASS
Fire sprinklers finaled
FIR03-00524 FIR-Aging Inspection7/8/20057/8/20057/8/2005 3:30:25 PM NR
Contractor will call in inspection next week.
FIR05-00357 INSP-Sprinkler Rough-in/Hydro7/8/20057/8/20057/8/2005 3:24:45 PMPPASS
Piping is ok to cover. Hydro test passed. Flush to be done when permit is pulled for construction of future building.
FIR03-00510 FIR-Aging Inspection7/8/20057/8/20057/8/2005 3:23:18 PM NR
I spoke with Mike and he is to follow up on job status.
BLD04-02480 FIRE-Final Inspection7/8/20057/8/20057/8/2005 1:53:04 PMPFAIL
Need to final the sprinkler permit. Remove the manual flush bolts on the double doors to the office and the threshold for these doors exceeds the 1/2" maximum.
BLD04-02480 FIRE-Conference7/8/20057/8/20057/8/2005 1:52:14 PMPFAIL
Need to final the sprinkler permit. Remove the manual flush bolts on the double doors to the office and the threshold for these doors exceeds the 1/2" maximum.
FIR05-00354 INSP-Final Inspection7/8/20057/8/20057/8/2005 1:45:53 PMPPASS
Fire alarm finaled
FIR04-00750 INSP-Sprinkler Rough-in/Hydro7/8/20057/8/20057/8/2005 11:43:05 AMPPART
Piping hydro tested from the point of connection to the backflow preventor and passed. Still need earthquake bracing installed on 3" supply main.
FIR03-00453 FIR-Aging Inspection7/8/20057/8/20057/8/2005 11:20:26 AM PASS
Permit finaled
MIS05-00100 FIR-Final7/7/20057/8/20057/8/2005 10:48:56 AMAPART
A temporary occupancy was given until the thumbturn is removed from the main exit, a sticker is attached and the existing fire sprinkler system gets its annual inspection
FIR04-00527 INSP-Final Inspection7/7/20057/8/20057/8/2005 10:18:43 AMAFAIL
Hood operated correctly and reported to the panel but all of the holes in the hood need repaired.
FIR03-00453 INSP-Final Inspection7/8/20057/8/20057/8/2005 12:00:00 AMPPASS
Permit finaled
FIR04-00743 INSP-Sprinkler Rough-in/Hydro7/8/20057/8/20057/8/2005 12:00:00 AMPPART
All piping was hydro tested and passed up to the new backflow preventor for the outside canopy . As far as the roughin, contractor needs to address deficiencies on the existing sprinkler piping such as lack of earthquake bracing, retaining straps and top beam clamps not attached to the top of the trusses.