FIR08-00302
| INSP-Sprinkler Rough-in/Hydro | 7/8/2008 | 7/8/2008 | 7/8/2008 5:24:27 PM | P | FAIL |
|
|
Completed only a preliminary field inspection as contractor did not provide approved plans, review notes, inspection record/permit card on site as required per condition of the permit for verification of compliance, missing branch line hangers at several locations, need to provide sealant at all penetrations by sprinkler drops at the cooler enclosure, two DP are not yet installed, rough-in install cannot be okayed until stamped plans and associated documents are provided.
|
FIR07-00932
| INSP-Supply line flush | 7/8/2008 | 7/8/2008 | 7/8/2008 5:13:16 PM | P | PART |
|
|
Inspection request was intended for an underground hydrostatic test. Testing completed okay, hydro passed.
|
BLD07-03052
| FIRE-Final Inspection | 7/8/2008 | 7/8/2008 | 7/8/2008 3:21:56 PM | P | PASS |
|
|
C/N items are finished, fire life safety finaled.
|
FIR08-00467
| INSP-Final Inspection | 7/7/2008 | 7/8/2008 | 7/8/2008 2:59:29 PM | P | PASS |
|
|
Scope of fire sprinkler work passed final inspection, permit finaled.
|
FIR08-00369
| INSP-Supply line flush | 7/2/2008 | 7/8/2008 | 7/8/2008 12:10:48 PM | A | PART |
|
|
Field inspection was intended for an UG hydrostatic test. Hydro completed satisfactory-testing passed.
|
FIR08-00369
| INSP-Sprinkler Rough-in/Hydro | 7/8/2008 | 7/8/2008 | 7/8/2008 12:04:21 PM | P | PART |
|
|
UG fire supply line installation is approved for bury.
|
BLD08-00658
| FIRE-Final Inspection | 7/7/2008 | 7/8/2008 | 7/8/2008 12:03:25 PM | A | FAIL |
|
|
Missing two exit signs as shown on stamped plan set, provide and post one fire extinguisher with a current certification tag, noted one storage room lacking proper fire sprinkler coverage, tenant expansion into the adjacent space will require extension of the building fire alarm system to maintain proper notification coverage-see details pertaining to fire alarm and sprinkler permits on the approved plan set fire code review notes.
|