Inspections for the day of: Tuesday, July 8, 2008.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00373 INSP-Sprinkler Rough-in/Hydro7/8/20087/8/20087/8/2008 4:46:28 PMPFAIL
As-builts need to be provided showing the pipe route changes. See the city approved plans for locations where sprinkler pendants are located too close, too far off of walls and where no sprinkler protection has been provided. One location needs the tenting improved.
FIR08-00243 INSP-Sprinkler Rough-in/Hydro7/8/20087/8/20087/8/2008 4:44:12 PMPFAIL
The overhead hydro failed. No rough-in inspection performed.
FIR08-00295 INSP-Sprinkler Rough-in/Hydro7/8/20087/8/20087/8/2008 4:43:09 PMPPART
The overhead hydro test passed. The rough-in is passable except longitudinal earthquake bracing has not been installed as required by chapter 9.
BLD08-01038 FIRE-Final Inspection7/7/20087/8/20087/8/2008 11:57:58 AMAPASS
life safety passed.
BLD05-03072 FIRE-Final Inspection7/7/20087/8/20087/8/2008 9:17:13 AMAPASS
Life safety passed.