ESC09-00417
| Site Preparation | 7/8/2009 | 7/8/2009 | 7/9/2009 2:46:30 PM | P | PASS |
|
|
|
BLD09-01113
| BLD-Final | 7/8/2009 | 7/8/2009 | 7/8/2009 4:28:40 PM | P | PART |
|
|
Richard ###-#### please call 30 prior to meet (scheduled both fire l/s and final for 7/8/09 PM) temp occ ok
|
ESC09-00206
| Random Inspection | 7/8/2009 | 7/8/2009 | 7/8/2009 4:19:30 PM | P | PASS |
|
|
|
BLD09-01096
| BLD-Footing | 7/7/2009 | 7/8/2009 | 7/8/2009 3:06:28 PM | A | PART |
|
|
john Phone #: ###-####
|
ESC08-00836
| Site Final | 7/2/2009 | 7/8/2009 | 7/8/2009 3:05:45 PM | A | NR |
|
|
ruston Phone #: ###-#### wip
|
BLD09-01034
| BLD-Conference | 7/8/2009 | 7/8/2009 | 7/8/2009 2:53:48 PM | P | PASS |
|
|
PJ Phone #: ###-#### egress should be ok w/ existing historic windows, 20" wide,,
|
ESC09-00192
| Site Preparation | 7/8/2009 | 7/8/2009 | 7/8/2009 2:46:55 PM | P | PASS |
|
|
|
BLD09-00464
| BLD-Framing/Rough-in | 7/7/2009 | 7/8/2009 | 7/8/2009 2:37:54 PM | A | PART |
|
|
Craig please call when you get to job site so he can meet you out back. Phone #: ###-#### seismic strapping in attic and other areas as noted on plans
|
BLD09-00531
| BLD-Footing | 7/7/2009 | 7/8/2009 | 7/8/2009 12:54:26 PM | A | PASS |
|
|
Farris please call 45 min before going out Phone #: ###-#### POST HOLES OK
|
MIS09-00121
| BLD-Conference | 7/7/2009 | 7/8/2009 | 7/8/2009 12:02:15 PM | A | PASS |
|
|
nick hurren 603 e ocelot crt in meridian is who was installing new roof--please contact ###-#### Dan with Dan's quality roofing regarding this complaint,, check back on project,, ISSUED NOW, OK
|
MIS09-00121
| DOC - Permit Finaled | 7/8/2009 | 7/8/2009 | 7/8/2009 12:02:08 PM | P | PASS |
|
|
OK
|
BLD09-00493
| BLD-Framing/Rough-in | 7/7/2009 | 7/8/2009 | 7/8/2009 10:12:47 AM | A | NR |
|
|
Terry please call 1/2 hr before going out Phone #: ###-####
|