ESC09-00395
| Site Preparation | 7/8/2009 | 7/8/2009 | 7/8/2009 7:21:56 AM | | NR |
|
|
Work has not started.
|
ESC09-00286
| Conference | 7/8/2009 | 7/8/2009 | 7/8/2009 12:00:00 AM | A | DONE |
|
|
Received telephone call from Phil Jones on behalf of Knife River. De-watering is again occurring off site because the west basin is to capacity. The contractor will be adding additional controls which will hold larger volumn of water prior to discharge. By holding the water longer should decrease turbid discharge into Welling Creek. It was stated to Mr. Jones that it is their responsibility to comply with discharge turbid levels for compliance to the State of Idaho Surface Water Quality Standards.
|