ESC10-00008
| Random Inspection | 7/8/2010 | 7/8/2010 | 7/8/2010 2:49:51 PM | P | NR |
|
|
No signs of work.
|
ESC09-00352
| General Inspection ESC | 7/8/2010 | 7/8/2010 | 7/8/2010 2:22:18 PM | | PART |
|
|
Discussed with RP regarding park: To summarize, Wellings re-work to commence soon, DR4 has been approved and work is being perfomed to "green up" the park area of the project, including misc swells, final grade, spreading topsoil, pressize irragation. Notice river side "check berms" are greening up nicely and live cuttings continue to green up as well between the check berms. Informed RP that stockpile material by the lift station needed temporary stabilization. As well, who and when will the approachs from the new ped. bridge be done? Overall things are progressing.
|
ESC09-00507
| General Inspection | 7/8/2010 | 7/8/2010 | 7/8/2010 1:26:35 PM | P | PART |
|
|
BMP's have been repaired or replaces where needed. Yellow sign needs new RP name and contact number instead of prior RP & contractor.
|
ESC10-00497
| Site Preparation | 7/8/2010 | 7/8/2010 | 7/8/2010 7:51:45 AM | | CANC |
|
|
Inspector 415 passed on 7/6/10
|