FIR05-00109
| INSP-Conference | 7/2/2010 | 7/7/2010 | | A | |
|
|
Follow up conference with Mike; ###-####
|
BLD10-01260
| FIRE-Final Inspection | 7/7/2010 | 7/8/2010 | 7/9/2010 4:30:14 PM | A | FAIL |
|
|
All life safety items have been addressed except for the secondary exit at the east/rear door
|
FIR09-00110
| FIR-Aging Inspection | 7/8/2010 | 7/8/2010 | 7/9/2010 12:11:16 PM | | NR |
|
|
Per Bill all of the AES permits are being scheduled.
|
BLD10-00660
| FIRE-Conference | 7/8/2010 | 7/8/2010 | 7/8/2010 3:50:42 PM | P | FAIL |
|
|
All life safety items are ok but the equipment installers are removing the sheetrock that was just installed to cover the exposed wood above the ceilings. The project needs re-inspected after this equipment installation to verify that the wood has been re-covered.
|
FIR09-00277
| INSP-Final Inspection | 7/8/2010 | 7/8/2010 | 7/8/2010 3:44:09 PM | P | CANC |
|
|
Rescheduled for tomorrow due to micron plan review today.
|
FIR10-00237
| INSP-Final Inspection | 7/7/2010 | 7/8/2010 | 7/8/2010 3:37:31 PM | P | PASS |
|
|
Permit finaled
|
FIR10-00155
| INSP-Final Inspection | 7/8/2010 | 7/8/2010 | 7/8/2010 2:43:33 PM | P | PASS |
|
|
Permit finaled
|
BLD10-00621
| FIRE-Final Inspection | 7/7/2010 | 7/8/2010 | 7/8/2010 1:24:10 PM | A | FAIL |
|
|
This inspection was actually for a conference on the life safety requirements for this project. I went over a map to the city clerk, covers on the receptacles, smoke alarms, door hardware, exit discharge lights, testing exit lights/emergency lights and fire extinguishers.
|
BLD10-00779
| FIRE-Final Inspection | 7/7/2010 | 7/8/2010 | 7/8/2010 11:10:34 AM | P | FAIL |
|
|
Correct hardware needs to be provided out of the east exit door of the breakroom and the project related fire alarm permit needs finaled.
|
BLD10-01418
| FIRE-Final Inspection | 7/7/2010 | 7/8/2010 | 7/8/2010 11:10:06 AM | A | PASS |
|
|
Life safety passed.
|
FIR10-00303
| INSP-Final Inspection | 7/7/2010 | 7/8/2010 | 7/8/2010 11:07:37 AM | A | FAIL |
|
|
All devices were tested but the duct detectors have been wired to a single zone instead of the three individual zones per the approved plans. I waited on site while the alarm installer tried to get things changed but when we tested the duct on zone 6 the hvac unit did not shut down. The inspection was stopped. All duct smoke detectors will need to be retested to verify shutdown and correct zone labeling/monitoring and a signal report will need to be provided. A map at the FACP is required as well.
|
FIR10-00245
| INSP-Final Inspection | 7/7/2010 | 7/8/2010 | 7/8/2010 11:01:59 AM | A | PART |
|
|
A temporary occupancy was given on this permit with Marks permission until the two sprinkler heads are installed in the conveyor.
|
BLD10-01016
| FIRE-Conference | 7/8/2010 | 7/8/2010 | 7/8/2010 10:58:14 AM | P | DONE |
|
|
I notified the general contractor that it is very possible that fire alarm system modifications will be required due to the new wall blocking coverage of an existing horn/strobe. Any modifications would require a permit.
|
FIR10-00312
| INSP-Sprinkler Rough-in/Hydro | 7/7/2010 | 7/8/2010 | 7/8/2010 8:59:07 AM | A | PASS |
|
|
piping is ok to cover
|
BLD10-01416
| FIRE-Final Inspection | 7/2/2010 | 7/8/2010 | 7/8/2010 12:00:00 AM | P | CANC |
|
|
call 30 min prior//Tad Arnt Phone #: ###-####
|