Inspections for the day of: Friday, July 8, 2011.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00002 Aging Inspection7/8/20117/8/20117/11/2011 4:39:24 PM PASS
ESC10-00739 Random Inspection7/8/20117/8/20117/8/2011 4:52:55 PMPPASS
BLD10-01084 BLD-Conference7/8/20117/8/20117/8/2011 4:52:36 PMPPASS
BLD11-01318 BLD-Final7/8/20117/8/20117/8/2011 3:52:41 PMPPASS
Doug Phone #: ###-####
BLD11-01318 DOC - Permit Finaled7/8/20117/8/20117/8/2011 3:52:29 PMPPASS
BLD11-00147 BLD-Conference7/8/20117/8/20117/8/2011 3:52:14 PMPPASS
walked job w/special insp. first truss erected and dba's aproved on pour deck. waitting for rebar rfi for slab depth and bar details recieved from engineer.
BLD10-02349 BLD-Final7/8/20117/8/20117/8/2011 3:18:44 PMPPASS
JOHN Phone #: ###-####
BLD10-02847 BLD-Final7/8/20117/8/20117/8/2011 2:33:30 PMPNR
larry Phone #: ###-#### need p$z and fire sign offs.
ESC10-00891 Random Inspection7/8/20117/8/20117/8/2011 2:26:41 PMPDONE
ESC10-00891 DOC - Permit Finaled7/8/20117/8/20117/8/2011 2:26:22 PMPPASS
BLD11-00676 BLD-Framing/Rough-in7/8/20117/8/20117/8/2011 2:24:05 PMPPASS
larry Phone #: ###-####
ESC11-00186 Random Inspection7/8/20117/8/20117/8/2011 2:23:31 PMPPASS
BLD11-00845 BLD-Framing/Rough-in7/8/20117/8/20117/8/2011 1:56:47 PMPPART
kevin Phone #: ###-#### aproved plan trequires 3 pc 2x10 over east slidding door. ok to insulate.
BLD11-00407 BLD-Concrete7/8/20117/8/20117/8/2011 1:20:49 PMPPASS
Rob-please call prior to inspection-pouring concrete at 1:00 Phone #: ###-#### 2nd floor landing ok
ESC11-00103 Random Inspection7/8/20117/8/20117/8/2011 1:20:18 PMPPASS
ESC11-00243 Random Inspection7/8/20117/8/20117/8/2011 12:09:05 PMAPASS
BLD11-00863 BLD-Framing/Rough-in7/7/20117/8/20117/8/2011 12:08:48 PMAPART
John Phone #: ###-#### need mech aproval ok to insulate/ need 6 side r-19 at attic of vault.
BLD11-01256 BLD-Final7/7/20117/8/20117/8/2011 12:05:36 PMAPART
John Phone #: ###-#### need mech completed/ need east and west r-19 at vault incapsulated on 6 sides/ ok to insulate upon mech aproval.
BLD11-01256 DOC - Permit Finaled7/8/20117/8/20117/8/2011 12:05:35 PMPPASS
ESC11-00360 Site Preparation7/8/20117/8/20117/8/2011 9:53:33 AMAPART
need to post sign.
BLD11-01292 BLD-Footing7/7/20117/8/20117/8/2011 9:52:54 AMAPASS
bill Phone #: ###-####
ESC11-00154 Site Final7/8/20117/8/20117/8/2011 9:26:22 AMADONE
ESC11-00154 DOC - Permit Finaled7/8/20117/8/20117/8/2011 9:26:10 AMPPASS
BLD11-00548 BLD-Final7/7/20117/8/20117/8/2011 9:25:43 AMAPASS
brett Phone #: ###-####
BLD11-00548 DOC - Permit Finaled7/8/20117/8/20117/8/2011 9:25:32 AMPPASS