ELE11-00609
| Electrical Rough-In | 7/8/2011 | 7/8/2011 | 7/8/2011 2:47:54 PM | P | PASS |
|
|
jason Phone #: ###-#### 1st floor ceiling ok cover anop
|
ELE11-01110
| Final | 7/8/2011 | 7/8/2011 | 7/8/2011 1:49:07 PM | P | FAIL |
|
|
Ready for final thank you Brad Phone #: ###-#### >> Inspection requested via web by Brad Baker called, left correction notice, BCC shall provide structural support wires for ceiling fixtures, wire water heater, rest ok
|
ELE11-01491
| Temporary Service | 7/8/2011 | 7/8/2011 | 7/8/2011 12:43:11 PM | P | PASS |
|
|
Darryn Phone #: ###-#### t/s u/g n ok
|
ELE11-01171
| Final | 7/7/2011 | 7/8/2011 | 7/8/2011 10:24:37 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Joe Thomas ok final
|
ELE11-01478
| Conference | 7/7/2011 | 7/8/2011 | 7/8/2011 10:21:20 AM | A | DONE |
|
|
vance Phone #: ###-#### talked about u/g for hot tub, labelled tub, service change, receptacle for tub, inspection process
|
ELE11-01393
| Rough-In Permanent Service | 7/7/2011 | 7/8/2011 | 7/8/2011 9:56:51 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Tracy Robertson corrections made, ri ok, p/s u/g n ok
|
ELE08-02423
| Electrical Rough-In | 7/7/2011 | 7/8/2011 | 7/8/2011 9:18:05 AM | A | PASS |
|
|
Jason B2 L4 Soffits Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok cover soffits 4th floor anop
|
ELE11-01459
| Electrical Rough-In | 7/7/2011 | 7/8/2011 | 7/8/2011 8:40:10 AM | A | PASS |
|
|
THIS IS INSIDE ADA COUNTY JAIL JURY ROOM AND HAS TO BE INSPECTED BEFORE 11AM 7-8-11 PLEASE CALL BEFORE GOING SO I CAN SCHEDULE ESCORT Phone #: ###-#### >> Inspection requested via web by Karl Paige ok cover new wall only
|