Inspections for the day of: Friday, July 8, 2011.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00370 Site Preparation7/8/20117/8/20117/19/2011 9:41:57 AM DONE
BLD11-01468 BLD-Final7/8/20117/8/20117/8/2011 4:27:23 PMPPASS
Doug Phone #: ###-####
BLD11-01468 DOC - Permit Finaled7/8/20117/8/20117/8/2011 4:27:04 PMPPASS
BLD11-01188 BLD-Final7/8/20117/8/20117/8/2011 4:09:11 PMPPASS
Doug Phone #: ###-####
BLD11-01188 DOC - Permit Finaled7/8/20117/8/20117/8/2011 4:08:52 PMPPASS
ESC11-00122 Random Inspection7/8/20117/8/20117/8/2011 3:47:38 PMPPASS
BLD11-00454 BLD-Framing/Rough-in7/8/20117/8/20117/8/2011 3:47:22 PMPPASS
jared Phone #: ###-####
BLD11-01156 BLD-Framing/Rough-in7/8/20117/8/20117/8/2011 3:25:17 PMPPASS
byron Phone #: ###-####
ESC11-00325 Random Inspection7/8/20117/8/20117/8/2011 3:24:59 PMPPASS
BLD11-01328 BLD-Final7/7/20117/8/20117/8/2011 2:51:39 PMPPASS
call 1st,, jenny Phone #: ###-####,, call 1st
MIS11-00161 DOC - Permit Finaled7/8/20117/8/20117/8/2011 2:51:27 PMPPASS
ESC11-00259 Random Inspection7/8/20117/8/20117/8/2011 2:10:45 PMPPASS
BLD11-00776 BLD-Framing/Rough-in7/8/20117/8/20117/8/2011 2:07:54 PMPPASS
John-PLease call prior to inspection Phone #: ###-####
BLD10-02870 BLD-Framing/Rough-in7/7/20117/8/20117/8/2011 12:10:38 PMAPASS
level 2//Mike Phone #: ###-####
BLD06-02323 BLD-Energy code compliance7/6/20117/8/20117/8/2011 12:09:35 PMAPASS
BLD11-00896 BLD-Conference7/8/20117/8/20117/8/2011 10:32:16 AMADONE
field reveiw
BLD11-00925 BLD-Framing/Rough-in7/7/20117/8/20117/8/2011 10:17:52 AMAPASS
j.p. - as early as possible please Phone #: ###-#### needs elec rough in
BLD11-01337 BLD-Conference7/7/20117/8/20117/8/2011 9:10:37 AMAPASS
fench not on prop line use survey stakes