FIR11-00159
| INSP-Sprinkler Rough-in | 7/7/2011 | 7/8/2011 | 7/8/2011 3:24:05 PM | P | PART |
|
|
The majority of the area looked at this afternoon was the Upper Level. There are still several outstanding items which include missing retaining straps, overspaced heads, missing heads, need for trapeze hangers in the warehouse and possible obstructions caused by the valances in the display areas. The piping arrangement does not match the plans so plan modifications will be required prior to a final sign off. The lower level truck dock dry system was inspected today as well. Revised hydraulic calculations were submitted and approved by Tim Frost for this area. I need verification that the top beam clamps have been welded to the beam flange or new hangers installed. Tim Frost noted a Trash Compactor area which is lacking sprinkler protection.
|
FIR11-00082
| INSP-Final Inspection | 7/7/2011 | 7/8/2011 | 7/8/2011 3:17:54 PM | A | PASS |
|
|
Permit finaled.
|
FIR11-00159
| INSP-Sprinkler Rough-in | 7/7/2011 | 7/8/2011 | 7/8/2011 11:15:13 AM | A | PASS |
|
|
The second floor elevator room and the area around the escalator, at the second floor, is ok to cover.
|
FIR11-00095
| INSP-Sprinkler Rough-in/Hydro | 7/7/2011 | 7/8/2011 | 7/8/2011 11:13:44 AM | A | PART |
|
|
Todays inspection was for the second floor of the office area. There were two retaining strap issues and the 3" sprinkler main was missing all of the trapeze hangers. The hardlid area in the north east corner is ok to cover. Also a separate inspection will be required when the arm-overs and drops have been installed in the gridded ceiling areas.
|
FIR11-00238
| INSP-Sprinkler Rough-in | 7/7/2011 | 7/8/2011 | 7/8/2011 11:00:27 AM | A | PASS |
|
|
The piping in the modified soffit area is ok to cover.
|
BLD11-00165
| FIRE-Final Inspection | 7/8/2011 | 7/8/2011 | 7/8/2011 12:00:00 AM | P | CANC |
|
|
jack Phone #: ###-####
|
BLD11-00164
| FIRE-Final Inspection | 7/8/2011 | 7/8/2011 | 7/8/2011 12:00:00 AM | P | CANC |
|
|
jack Phone #: ###-####
|