ELE13-01449
| Conference | 7/8/2013 | 7/8/2013 | 7/9/2013 4:42:09 AM | P | DONE |
|
|
Mike Phone #: ###-#### talked about remodel
|
ELE13-01748
| Electrical Rough-In | 7/8/2013 | 7/8/2013 | 7/8/2013 1:33:39 PM | P | FAIL |
|
|
underground only called, left message, left card, BCC shall not cover electrical until inspected, fee due
|
ELE13-01427
| Final | 7/8/2013 | 7/8/2013 | 7/8/2013 12:41:52 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by ERIC CENTERS ok final
|
ELE13-01747
| Temporary Service | 7/8/2013 | 7/8/2013 | 7/8/2013 12:12:22 PM | P | FAIL |
|
|
Please inspect so we can get this energized by Idaho Power. Phone #: ###-#### >> Inspection requested via web by David Mackey called, left message, ground wire loose, no job id sticker, no esc sign
|
ELE13-01732
| Electrical Rough-In | 7/5/2013 | 7/8/2013 | 7/8/2013 9:43:21 AM | A | PART |
|
|
job is complete Phone #: ###-#### >> Inspection requested via web by Stuart Welton called, ok cover front 1/2 walls only, will call for rear walls, left correction notice stating BCC shall install seismic wires,remove abandoned low voltage cables, shall not leave any wiring on tiles or grid
|
ELE13-01330
| Final | 7/3/2013 | 7/8/2013 | 7/8/2013 9:11:32 AM | A | CANC |
|
|
Kevin the contractor said he would be there. Phone #: ###-#### >> Inspection requested via web by Craig Korell see final response
|
ELE13-01330
| Final | 7/3/2013 | 7/8/2013 | 7/8/2013 9:10:44 AM | A | PASS |
|
|
Kevin the contractor said he would be there. Phone #: ###-#### >> Inspection requested via web by Craig Korell ok final
|
ELE13-01679
| Final | 7/5/2013 | 7/8/2013 | 7/8/2013 8:34:28 AM | A | PASS |
|
|
Brandon Phone #: ###-#### met electrician, ok final
|