Inspections for the day of: Monday, July 8, 2013.
Number of inspections: 16
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-01158 Aging Inspection7/5/20137/5/2013   
ESC13-00235 Random Inspection7/8/20137/8/20137/8/2013 5:02:11 PMPPASS
BLD13-00556 BLD-Footing7/8/20137/8/20137/8/2013 5:01:56 PMPPASS
ESC13-00229 Random Inspection7/8/20137/8/20137/8/2013 5:01:41 PMPPASS
ESC13-00238 Random Inspection7/8/20137/8/20137/8/2013 5:01:27 PMPPASS
BLD13-00544 BLD-Footing7/8/20137/8/20137/8/2013 5:01:10 PMPPASS
BLD13-00550 BLD-Footing7/8/20137/8/20137/8/2013 5:00:51 PMPPASS
BLD13-01290 BLD-Energy code compliance7/8/20137/8/20137/8/2013 3:33:00 PMPPASS
foundation insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue. R-10 rigid insulation and thermal break on interior side of stemwall under slab on grade.
BLD13-00833 BLD-Framing/Rough-in7/5/20137/8/20137/8/2013 2:58:58 PMPFAIL
framing and wall bracing//Ivan Phone #: ###-####. Needs to frame per the engineered drawings.
BLD13-00789 BLD-Energy code compliance7/8/20137/8/20137/8/2013 2:58:13 PMPPASS
miguel Phone #: ###-####. Wing B classroom side.
BLD13-00789 BLD-Framing/Rough-in7/8/20137/8/20137/8/2013 2:57:54 PMPPASS
miguel Phone #: ###-####. Wing C hallway side.
BLD13-00556 BLD-Footing7/3/20137/8/20137/8/2013 10:49:54 AMANR
Greg Phone #: ###-####
BLD13-00544 BLD-Footing7/3/20137/8/20137/8/2013 10:49:21 AMANR
Greg Phone #: ###-####
BLD13-00550 BLD-Footing7/3/20137/8/20137/8/2013 10:48:46 AMANR
Greg Phone #: ###-####
BLD13-00888 BLD-Foundation7/3/20137/8/20137/8/2013 10:16:54 AMAPART
Requests early - Dane Phone #: ###-####. Ok pending special inspection.
BLD13-01290 BLD-Energy code compliance7/8/20137/8/20137/8/2013 10:16:09 AMAFAIL
Foundation Insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue. Provide 24 inches of R-10 rigid insulation and the required thermal break.