MEC14-02745
| Final | 7/4/2014 | 7/8/2014 | 7/8/2014 4:43:54 PM | P | PASS |
|
|
Please Call Robbie ###-#### @ Jims Heating Prior To Inspection Thank You Phone #: ###-#### >> Inspection requested via web by Manuel Acuna
|
MEC14-02782
| Final | 7/7/2014 | 7/8/2014 | 7/8/2014 4:13:07 PM | P | NR |
|
|
Please do a flu inspection test. please contact Eric with any further questions - ###-#### Phone #: ###-#### >> Inspection requested via web by Bailey Esposito
|
MEC14-02608
| Final | 7/1/2014 | 7/8/2014 | 7/8/2014 3:40:01 PM | P | PASS |
|
|
This is a gas line pressure test, Flue Pressure and Final Inspect. Pls meet our installer at home at 1:00 PM . Install Mgr, Allen, Ph is ###-####. Phone #: ###-#### >> Inspection requested via web by Mary LaFayette
|
MEC14-02768
| Final | 7/7/2014 | 7/8/2014 | 7/8/2014 3:18:23 PM | P | PASS |
|
|
Please call Jean prior to arrival ###-####. Inspect 50 gal gas w/h. Phone #: ###-#### >> Inspection requested via web by James Staley
|
MEC14-02665
| Final | 7/8/2014 | 7/8/2014 | 7/8/2014 2:41:45 PM | P | PASS |
|
|
CALL ###-#### WITH ISSUES Thanks Joe Bertwell Phone #: ###-#### >> Inspection requested via web by Joe Bertwell
|
MEC14-02793
| Conference | 7/8/2014 | 7/8/2014 | 7/8/2014 2:11:45 PM | P | PASS |
|
|
Flue Test & Final Inspection- Please have inspector call Aaron the installer to meet for the flue test ###-#### Phone #: ###-#### >> Inspection requested via web by Carolyn Rudd
|
MEC14-02251
| Final | 7/8/2014 | 7/8/2014 | 7/8/2014 1:43:49 PM | P | PASS |
|
|
installer sam ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
MEC14-01147
| Final | 7/8/2014 | 7/8/2014 | 7/8/2014 1:26:55 PM | P | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by GREGORY ANDERSEN - need to support line sets on exterior of building, need to complete air balance on the units. reschedule when done.
|
MIS14-00153
| MEC-Conference | 7/7/2014 | 7/8/2014 | 7/8/2014 12:22:21 PM | A | FAIL |
|
|
After 10 am please-Fred***For Occupancy Phone #: ###-#### - Class 1 hood needs to extend 6" beyond the cooking equipment, currently the cooking equipment extends out past the hood. Grease duct for class 1 hood is not ran in approved material, needs to be changed out to meet code. Need stainless steel between class 1 hood & wall, on wall under hood, stainless steel needs to extend 18" out from edge of class 1 hood. Need make-up air for class 1 hood. Need econmizer for roof top unit. Need to support gas pipe on roof. Any exhaust or plumbing vents need to terminate 10' away or 3' above fresh air openings when make-up air, and economizer are installed.
|
MEC14-01853
| Final | 7/7/2014 | 7/8/2014 | 7/8/2014 10:44:58 AM | A | PASS |
|
|
Please call Cathy the homeowner B4 arrival. Phone #: ###-#### >> Inspection requested via web by Lisa Whitney
|
MEC14-02608
| Final | 7/1/2014 | 7/8/2014 | 7/1/2014 4:47:57 PM | P | CANC |
|
|
This is a Flue Pressure and Final Inspect. Pls meet our installer at home at 1:00 PM . Install Mgr, Allen, Ph is ###-####. Phone #: ###-#### >> Inspection requested via web by Mary LaFayette Inspection cancelled from web by: Mary LaFayette
|