FIR13-00630
| INSP-Conference | 7/8/2014 | 7/8/2014 | 7/9/2014 2:03:50 PM | P | DONE |
|
|
Rick Groom is going to follow up with Dave on job status
|
FIR13-00723
| INSP-Sprinkler Rough-in | 7/8/2014 | 7/8/2014 | 7/8/2014 3:25:38 PM | P | PART |
|
|
Hanger area piping rough-in passed. Could not give approval for cover on the second floor due to the approved 2 1/2" branchlines being installed as 2".
|
FIR14-00384
| INSP-Sprinkler Rough-in/Hydro | 7/7/2014 | 7/8/2014 | 7/8/2014 3:06:39 PM | P | PASS |
|
|
Overhead hydro tests passed. Rough-in passed. Tenting passed. Piping can be covered.
|
FIR14-00369
| INSP-Final Inspection | 7/8/2014 | 7/8/2014 | 7/8/2014 2:46:20 PM | P | CANC |
|
|
Not ready for final due to tampers and flow not tied to new fire alarm panel.
|
FIR14-00369
| INSP-Sprinkler Rough-in/Hydro | 7/8/2014 | 7/8/2014 | 7/8/2014 1:55:12 PM | P | PASS |
|
|
Hydro test passed. Forward flush passed. Rough-in passed. Adam was installing bags on heads.
|
FIR14-00416
| INSP-Sprinkler Rough-in | 7/8/2014 | 7/8/2014 | 7/8/2014 1:52:23 PM | P | PASS |
|
|
Underground ok to cover
|
BLD14-00455
| FIRE-Final Inspection | 7/7/2014 | 7/8/2014 | 7/8/2014 11:12:45 AM | A | FAIL |
|
|
Not ready for a final yet. Renny and I discussed general life safety requirements and walked the job.
|
FIR14-00396
| INSP-Sprinkler Rough-in | 7/8/2014 | 7/8/2014 | 7/8/2014 10:03:27 AM | P | PASS |
|
|
Underground ok to cover.
|