Inspections for the day of: Wednesday, July 8, 2020.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00623 INSP-Sprinkler Rough-in/Hydro7/8/20207/8/20207/8/2020 2:48:14 PMPPASS
System #1 overhead hydro witnessed with no pressure loss.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
FIR19-00836 INSP-Sprinkler Rough-in7/8/20207/8/20207/8/2020 2:46:50 PMPPART
Todays inspection was for the underground supply piping. The piping intself is ok but it can not be coverfed until a solution is proposed for the lack of minimum cover over this piping. I spoke to St. Lukes Construction, Rocky, and he will be speaking to their engineers for a solution. Yes we do need this underground cover inspection. Justin is the Foreman.
Thanks Brad Phone #: ###-#### Inspection requested via web by Brad Bettencourt
FIR20-00438 INSP-Sprinkler Rough-in7/8/20207/8/20207/8/2020 1:53:33 PMAPASS
Overhead piping to the new drops passed rough-in inspection. An additional inspection will be required when the grid and clouds have been installed.

Please contact Rick Fry for inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
FIR20-00340 INSP-Sprinkler Rough-in7/7/20207/8/20207/8/2020 1:52:20 PMAPART
The 6" supply line is ok to cover except where the PIV needs to be installed and the connection to the IBR. The remote FDC piping can be covered from the building to the end of the first 21' of pipe.

Underground -Dustin *screened* Phone #: ###-####
BLD19-04742 FIRE-Final Inspection7/7/20207/8/20207/8/2020 12:10:05 PMAFAIL
Wrong inspection called in.

Don Baldwin onsite contact for access business open at 8:30 AM. ###-####. If earlier, please call Don. He is driving in from Garden Valley.

Thank you!! Phone #: ###-#### Inspection requested via web by Ron Ramza
FIR19-00743 INSP-Final Inspection7/6/20207/8/20207/8/2020 11:27:22 AMAPASS
Permit finaled per Jim

Contact Tanner Loomis ###-#### 30 min prior to Fire Final Insp start please. Tanner is requesting an AM insp. time if possible.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR20-00074 INSP-Sprinkler Rough-in/Hydro7/7/20207/8/20207/8/2020 10:45:52 AMAPASS
See the city approved plans for two hardlids where piping is ok for cover. screened // kerry Phone #: ###-####
BLD20-01075 FIRE-Conference7/8/20207/8/20207/8/2020 10:33:50 AMPCANC
Phone #: ###-#### >> Inspection requested via web by rick pew Inspection cancelled from web by: rick pew
FIR20-00358 INSP-Final Inspection7/6/20207/8/20207/8/2020 9:22:51 AMAFAIL
Provide as-builts/plan mod fhowing the correct zone ayout and the installation of the heat instead of a smoke detector. The detector needs to be mounted with in 12" of the deck. Need map, knox box and correct size batteries installed. Need to test the flow switch and heat detector.

Please call 20-30 minutes prior to inspection. You will be meeting technician Justin Volquardsen on site. Phone #: ###-#### Inspection requested via web by jason petty