FIR19-00623
| INSP-Sprinkler Rough-in/Hydro | 7/8/2020 | 7/8/2020 | 7/8/2020 2:48:14 PM | P | PASS |
|
|
System #1 overhead hydro witnessed with no pressure loss.
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
FIR19-00836
| INSP-Sprinkler Rough-in | 7/8/2020 | 7/8/2020 | 7/8/2020 2:46:50 PM | P | PART |
|
|
Todays inspection was for the underground supply piping. The piping intself is ok but it can not be coverfed until a solution is proposed for the lack of minimum cover over this piping. I spoke to St. Lukes Construction, Rocky, and he will be speaking to their engineers for a solution. Yes we do need this underground cover inspection. Justin is the Foreman. Thanks Brad Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
FIR20-00438
| INSP-Sprinkler Rough-in | 7/8/2020 | 7/8/2020 | 7/8/2020 1:53:33 PM | A | PASS |
|
|
Overhead piping to the new drops passed rough-in inspection. An additional inspection will be required when the grid and clouds have been installed.
Please contact Rick Fry for inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
FIR20-00340
| INSP-Sprinkler Rough-in | 7/7/2020 | 7/8/2020 | 7/8/2020 1:52:20 PM | A | PART |
|
|
The 6" supply line is ok to cover except where the PIV needs to be installed and the connection to the IBR. The remote FDC piping can be covered from the building to the end of the first 21' of pipe.
Underground -Dustin *screened* Phone #: ###-####
|
BLD19-04742
| FIRE-Final Inspection | 7/7/2020 | 7/8/2020 | 7/8/2020 12:10:05 PM | A | FAIL |
|
|
Wrong inspection called in.
Don Baldwin onsite contact for access business open at 8:30 AM. ###-####. If earlier, please call Don. He is driving in from Garden Valley.
Thank you!! Phone #: ###-#### Inspection requested via web by Ron Ramza
|
FIR19-00743
| INSP-Final Inspection | 7/6/2020 | 7/8/2020 | 7/8/2020 11:27:22 AM | A | PASS |
|
|
Permit finaled per Jim
Contact Tanner Loomis ###-#### 30 min prior to Fire Final Insp start please. Tanner is requesting an AM insp. time if possible.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR20-00074
| INSP-Sprinkler Rough-in/Hydro | 7/7/2020 | 7/8/2020 | 7/8/2020 10:45:52 AM | A | PASS |
|
|
See the city approved plans for two hardlids where piping is ok for cover. screened // kerry Phone #: ###-####
|
BLD20-01075
| FIRE-Conference | 7/8/2020 | 7/8/2020 | 7/8/2020 10:33:50 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by rick pew Inspection cancelled from web by: rick pew
|
FIR20-00358
| INSP-Final Inspection | 7/6/2020 | 7/8/2020 | 7/8/2020 9:22:51 AM | A | FAIL |
|
|
Provide as-builts/plan mod fhowing the correct zone ayout and the installation of the heat instead of a smoke detector. The detector needs to be mounted with in 12" of the deck. Need map, knox box and correct size batteries installed. Need to test the flow switch and heat detector.
Please call 20-30 minutes prior to inspection. You will be meeting technician Justin Volquardsen on site. Phone #: ###-#### Inspection requested via web by jason petty
|