BLD19-03505
| BLD-Aging Inspection | 7/8/2020 | 7/8/2020 | 7/13/2020 7:16:42 AM | | PEND |
|
|
no inspections requested
|
BLD19-04272
| BLD-Aging Inspection | 7/8/2020 | 7/8/2020 | 7/9/2020 7:31:51 AM | | PASS |
|
|
WIP//
|
BLD19-04218
| BLD-Conference | 7/8/2020 | 7/8/2020 | 7/8/2020 4:37:58 PM | P | DONE |
|
|
Would like confirmation on what we are framing is getting accomplished correctly. Phone #: ###-#### Inspection requested via web by Shawn Whitaker
|
BLD19-04742
| BLD-Final | 7/7/2020 | 7/8/2020 | 7/8/2020 3:28:51 PM | P | CANC |
|
|
Don Baldwin onsite contact for access business open at 8:30 AM. ###-####.
Thank you!! Phone #: ###-#### Inspection requested via web by Ron Ramza//i believe this is the wrong permit, as a framing was canceled yesterday//final should have been for the main building, that permit is under review for a plan mod//let contact know the plan mod needs completed//
|
BLD19-04013
| BLD-Framing/Rough-in | 7/8/2020 | 7/8/2020 | 7/8/2020 3:09:33 PM | P | FAIL |
|
|
Matt - /*screened*/ Phone #: ###-####//corrections have not been completed to meet plans and specifications//See Matt onsite for CN//
|
BLD20-00751
| BLD-Final | 7/7/2020 | 7/8/2020 | 7/8/2020 2:12:07 PM | P | PASS |
|
|
GREG - /*screened*/ Phone #: ###-####//window installed, tempered is hazzard locatons//egress window sizes did not change from original they were chnaged like for like//interior remodel is complete, smoke and smoke co combo detectors installed and hard wired//
|
BLD20-00751
| DOC - Permit Finaled | 7/8/2020 | 7/8/2020 | 7/8/2020 2:10:30 PM | P | PASS |
|
|
|
BLD20-00381
| BLD-Energy code compliance | 7/8/2020 | 7/8/2020 | 7/8/2020 1:13:35 PM | P | PASS |
|
|
Randy - */Screened*/ Phone #: ###-####//contractor will make sure insulation shield is installed around hot water heater vent above garage prior to cover//
|
BLD20-01857
| BLD-Framing/Rough-in | 7/7/2020 | 7/8/2020 | 7/8/2020 12:05:21 PM | A | DEFR |
|
|
Taylor Barton is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting//no work needed to existing roof per the engineers letter stated in the project description from plan review//
|
BLD20-01045
| BLD-Footing | 7/7/2020 | 7/8/2020 | 7/8/2020 11:42:17 AM | A | NR |
|
|
Andy *screened* Phone #: ###-####//need PW approval for subgrade prior to scheduling inspection//
|
BLD20-01287
| BLD-Energy code compliance | 7/7/2020 | 7/8/2020 | 7/8/2020 11:28:46 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-01287
| BLD-Framing/Rough-in | 7/7/2020 | 7/8/2020 | 7/8/2020 11:28:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle//corrections made//
|
BLD17-03275
| BLD-Conference | 7/7/2020 | 7/8/2020 | 7/8/2020 11:27:56 AM | A | DONE |
|
|
Richard Phone #: ###-####//east setback is in question for irrigation easment//met onsite to discuss options//appears to be adequate space to move home forward on lot to provide added access on east side//advised owner to obtain written acceptance from Nampa Meridian irrigation for moving home forward, then submit revised site plan for city approval//
|
BLD19-04013
| BLD-Framing/Rough-in | 7/7/2020 | 7/8/2020 | 7/8/2020 10:24:40 AM | A | NR |
|
|
Matt - /*screened*/ Phone #: ###-####//corrections are not complete//moved to PM//
|
BLD20-01693
| BLD-Footing | 7/7/2020 | 7/8/2020 | 7/8/2020 10:11:11 AM | A | PART |
|
|
Kevin *screened* Phone #: ###-####//front pin on north side located, contractor pulled lengths to mark south pin on property, based on measurements and plans the new shop strucuture appears to be outside the 5' setback requirement at roughly 7 plus feet--front are rear setbacks ok//WIP//
|
BLD20-02088
| BLD-Final | 7/7/2020 | 7/8/2020 | 7/8/2020 10:09:08 AM | A | DONE |
|
|
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-02088
| DOC - Permit Finaled | 7/8/2020 | 7/8/2020 | 7/8/2020 10:08:59 AM | P | PASS |
|
|
roof appears to be compelted within code requirements//no access to back//
|
BLD20-01289
| BLD-Energy code compliance | 7/7/2020 | 7/8/2020 | 7/8/2020 9:21:42 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle//corrections made//
|
BLD19-04728
| BLD-Final | 7/7/2020 | 7/8/2020 | 7/8/2020 9:21:13 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Danny Pardee
|
BLD19-04728
| DOC - Permit Finaled | 7/8/2020 | 7/8/2020 | 7/8/2020 9:21:03 AM | P | PASS |
|
|
sige appears to be complete//
|