ELE01-01480
| ELE-Aging Inspection | 7/9/2001 | 7/9/2001 | 7/9/2001 12:00:00 AM | | PASS |
|
|
completed 7/9/2001 9:21:59 AM
|
ELE01-02210
| Final | 7/3/2001 | 7/9/2001 | 7/9/2001 12:00:00 AM | A | PASS |
|
|
street light: 2001.
p/s ug n alloway ele #2210. ok 7/9/2001 11:05:44 AM
|
ELE01-02209
| Final | 7/3/2001 | 7/9/2001 | 7/9/2001 12:00:00 AM | A | PASS |
|
|
streetlight 2001.
p/s ug n alloway ele #2209
at culdasac. 7/9/2001 9:18:54 AM
|
ELE00-00346
| ELE-Aging Inspection | 7/9/2001 | 7/9/2001 | 7/9/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 403 On 7/9/2001 11:15:20 AM no further action.
|
ELE01-02245
| Electrical Rough-In | 7/9/2001 | 7/9/2001 | 7/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 11:09:42. Contact: ###-####. p.v.c. conduit in trench, ok. 7/9/2001 2:05:32 PM
|
ELE01-02281
| Electrical Rough-In | 7/9/2001 | 7/9/2001 | 7/9/2001 12:00:00 AM | P | PART |
|
|
conference ###-####. new service panel/hot tub installation. 7/9/2001 1:44:56 PM
|
ELE01-02130
| Electrical Rough-In | 7/9/2001 | 7/9/2001 | 7/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 09:08:01. Contact: ###-####. guest suite; studio; utility rm; pantry, & basement r/i. 7/9/2001 3:02:27 PM
|
ELE01-02301
| Electrical Rough-In | 7/9/2001 | 7/9/2001 | 7/9/2001 12:00:00 AM | P | PART |
|
|
r.i. conference ###-####.. branch circuit code requirements. 7/9/2001 3:38:13 PM
|
ELE01-02306
| Electrical Rough-In | 7/9/2001 | 7/9/2001 | 7/9/2001 12:00:00 AM | P | FAIL |
|
|
###-#### upstairs rough-in. not completed. 7/9/2001 2:31:17 PM
|