ELE02-01748
| Final | 7/3/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PART |
|
|
###-#### loren call 1st please
signed T/O lacks furniture and floor boxes. 7/9/2002 11:03:52 AM
|
ELE02-01384
| Final | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PASS |
|
|
###-#### kurt
|
ELE02-01386
| Final | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PASS |
|
|
###-#### kurt
|
ELE02-01633
| Final | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PASS |
|
|
###-#### JOHN
|
ELE02-01749
| Permanent Service | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PASS |
|
|
rhonda ###-#### per ser for the house
already done by Tim 7/9/2002 12:05:12 PM
|
ELE02-01778
| Final | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 15:28:07. Contact: ###-####.
|
ELE02-01383
| Electrical Rough-In | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | FAIL |
|
|
bruce ###-#### BRAD CELL ###-####
protection of romex 7/9/2002 3:08:53 PM
|
ELE02-02064
| Electrical Rough-In | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | NR |
|
|
OFFICE ###-#### 3 A/C UNITS OPERATION BLD READY TO BE FINALED
did partial inspection and had conf. requires recep and grounding bushing. 7/9/2002 4:46:00 PM
|
ELE02-02077
| Rough-In Permanent Service | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | FAIL |
|
|
JEAN ###-####
box fill and unused openings 7/9/2002 5:48:48 PM
|
ELE02-02054
| Rough-In Permanent Service | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | NR |
|
|
CHRIS ###-#### had conf. 7/9/2002 2:20:01 PM
|
ELE02-01208
| Final | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | PASS |
|
|
JOHN ###-####
|
ELE02-01696
| Electrical Rough-In | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 10:02:32. Contact: ###-####.
U/G to transformer ok 7/9/2002 5:49:12 PM
|