Inspections for the day of: Tuesday, July 9, 2002.
Number of inspections: 114
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01195 BLD-Framing/Rough-in7/9/20027/9/20027/10/2002 12:00:00 AMPFAIL
###-#### todd c/n, draft stops; exh. ducts, insul at rim, etc; ok to insul only. 7/10/2002 10:12:42 AM
BLD02-00172 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
wendell jones ###-#### conf ...seal penetrations & separate ducting from 2hr exit enclosure. 7/9/2002 4:15:54 PM
BLD00-03729 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
referred to 409 7/9/2002 2:55:42 PM
BLD02-00579 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD00-03729 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
referred to 409 7/9/2002 2:55:42 PM
BLD02-00579 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC02-01748 Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/09/2002 at 05:58:11. Contact: ###-####.
BLD02-00926 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
CURTIS ###-#### add nail at sills & rafter ties per UBC schedule 7/9/2002 2:54:37 PM
BLD02-00172 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
wendell jones ###-#### conf ...seal penetrations & separate ducting from 2hr exit enclosure. 7/9/2002 4:15:54 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC02-01748 Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/09/2002 at 05:58:11. Contact: ###-####.
BLD02-00926 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
CURTIS ###-#### add nail at sills & rafter ties per UBC schedule 7/9/2002 2:54:37 PM
BLD01-01860 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAFAIL
STEVE ###-#### Need shear insp, plans, etc..wants hvac "consult" but no MEC permit...advised for 415 to resolve as he posted c/n. 7/9/2002 9:21:15 AM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD02-01464 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
###-#### RICHARD shear ok; frame ok to insul...pend plbg ok 7/9/2002 10:29:05 AM
BLD02-01376 BLD-Footing7/8/20027/9/20027/9/2002 12:00:00 AMAFAIL
ft insp- clay- ###-####...nr, need plans & eng's ok for excavation 7/9/2002 9:35:14 AM
BLD02-00172 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
wendell jones ###-#### conf ...seal penetrations & separate ducting from 2hr exit enclosure. 7/9/2002 4:15:54 PM
BLD02-00172 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
wendell jones ###-#### conf ...seal penetrations & separate ducting from 2hr exit enclosure. 7/9/2002 4:15:54 PM
BLD02-00926 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
CURTIS ###-#### add nail at sills & rafter ties per UBC schedule 7/9/2002 2:54:37 PM
BLD02-00926 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
CURTIS ###-#### add nail at sills & rafter ties per UBC schedule 7/9/2002 2:54:37 PM
MEC02-01851 Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
BRENDA ###-####
BLD02-01501 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
JAN ###-#### PLEASE CALL 30 MIN BEFORE SO SHE CAN MEET YOU THERE ...
BLD02-00579 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD02-00579 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
BLD00-03729 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
referred to 409 7/9/2002 2:55:42 PM
BLD00-03729 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
referred to 409 7/9/2002 2:55:42 PM
BLD02-01467 BLD-Footing7/8/20027/9/20027/9/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/08/2002 at 21:55:07. Contact: .isolated ftgs ok 7/9/2002 10:47:50 AM
MEC02-01748 Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/09/2002 at 05:58:11. Contact: ###-####.
MEC02-01748 Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/09/2002 at 05:58:11. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC02-01748 Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/09/2002 at 05:58:11. Contact: ###-####.
BLD02-00926 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
CURTIS ###-#### add nail at sills & rafter ties per UBC schedule 7/9/2002 2:54:37 PM
BLD00-03729 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
referred to 409 7/9/2002 2:55:42 PM
BLD02-00579 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD00-03729 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
referred to 409 7/9/2002 2:55:42 PM
BLD02-00579 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC02-01748 Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/09/2002 at 05:58:11. Contact: ###-####.
BLD02-00926 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
CURTIS ###-#### add nail at sills & rafter ties per UBC schedule 7/9/2002 2:54:37 PM
BLD00-03729 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
referred to 409 7/9/2002 2:55:42 PM
BLD02-00579 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC02-01748 Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/09/2002 at 05:58:11. Contact: ###-####.
BLD02-00926 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
CURTIS ###-#### add nail at sills & rafter ties per UBC schedule 7/9/2002 2:54:37 PM
BLD02-00172 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
wendell jones ###-#### conf ...seal penetrations & separate ducting from 2hr exit enclosure. 7/9/2002 4:15:54 PM
BLD00-03729 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
referred to 409 7/9/2002 2:55:42 PM
BLD02-00579 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC02-01748 Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/09/2002 at 05:58:11. Contact: ###-####.
BLD02-00926 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
CURTIS ###-#### add nail at sills & rafter ties per UBC schedule 7/9/2002 2:54:37 PM
BLD02-00172 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
wendell jones ###-#### conf ...seal penetrations & separate ducting from 2hr exit enclosure. 7/9/2002 4:15:54 PM
BLD00-03729 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
referred to 409 7/9/2002 2:55:42 PM
BLD02-00579 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC02-01748 Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/09/2002 at 05:58:11. Contact: ###-####.
BLD02-00926 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
CURTIS ###-#### add nail at sills & rafter ties per UBC schedule 7/9/2002 2:54:37 PM
BLD02-00172 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
wendell jones ###-#### conf ...seal penetrations & separate ducting from 2hr exit enclosure. 7/9/2002 4:15:54 PM
BLD00-03729 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
referred to 409 7/9/2002 2:55:42 PM
BLD02-00579 BLD-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
need archs details for wet wall/shaft assy. 7/9/2002 2:55:26 PM
MEC01-03061 Final7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/08/2002 at 11:07:53. Contact: ###-####.
BLD01-02348 BLD-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAFAIL
need to insulate floor/fnd at add'n 7/9/2002 12:08:11 PM
MEC02-01748 Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 07/09/2002 at 05:58:11. Contact: ###-####.
BLD02-00926 BLD-Framing/Rough-in7/8/20027/9/20027/9/2002 12:00:00 AMAPART
CURTIS ###-#### add nail at sills & rafter ties per UBC schedule 7/9/2002 2:54:37 PM
BLD02-00845 BLD-Final7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
fn insp shawn ###-#### l/c issued. 7/9/2002 4:14:07 PM
BLD02-01104 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPFAIL
fn rich- ###-####...add ADA signage, p-trap pads, secure & brace shelving. 7/9/2002 3:29:44 PM ok for t/o 7/9/2002 4:13:43 PM
BLD02-00222 BLD-Foundation7/9/20027/9/20027/9/2002 12:00:00 AMPPART
poured, appears ok
BLD02-00222 BLD-Framing/Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
JEAN ###-####
BLD02-00845 BLD-Final7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
fn insp shawn ###-#### l/c issued. 7/9/2002 4:14:07 PM
BLD02-01104 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPFAIL
fn rich- ###-####...add ADA signage, p-trap pads, secure & brace shelving. 7/9/2002 3:29:44 PM ok for t/o 7/9/2002 4:13:43 PM
BLD02-00222 BLD-Framing/Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
JEAN ###-####
BLD02-00845 BLD-Final7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
fn insp shawn ###-#### l/c issued. 7/9/2002 4:14:07 PM
BLD02-01104 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPFAIL
fn rich- ###-####...add ADA signage, p-trap pads, secure & brace shelving. 7/9/2002 3:29:44 PM ok for t/o 7/9/2002 4:13:43 PM
BLD02-00222 BLD-Foundation7/9/20027/9/20027/9/2002 12:00:00 AMPPART
poured, appears ok
BLD02-01104 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPFAIL
fn rich- ###-####...add ADA signage, p-trap pads, secure & brace shelving. 7/9/2002 3:29:44 PM ok for t/o 7/9/2002 4:13:43 PM
BLD02-00222 BLD-Foundation7/9/20027/9/20027/9/2002 12:00:00 AMPPART
poured, appears ok
BLD02-01104 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPFAIL
fn rich- ###-####...add ADA signage, p-trap pads, secure & brace shelving. 7/9/2002 3:29:44 PM ok for t/o 7/9/2002 4:13:43 PM
BLD02-00222 BLD-Foundation7/9/20027/9/20027/9/2002 12:00:00 AMPPART
poured, appears ok
BLD02-01104 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPFAIL
fn rich- ###-####...add ADA signage, p-trap pads, secure & brace shelving. 7/9/2002 3:29:44 PM
BLD02-00845 BLD-Final7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
fn insp shawn ###-#### l/c issued. 7/9/2002 4:14:07 PM
BLD02-00845 BLD-Final7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
fn insp shawn ###-#### l/c issued. 7/9/2002 4:14:07 PM
BLD02-01402 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPPASS
MIKE ###-#### WILL NEED TO CALL SO MIKE CAN OPEN HOUSE
BLD02-01104 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPFAIL
fn rich- ###-####...add ADA signage, p-trap pads, secure & brace shelving. 7/9/2002 3:29:44 PM
BLD02-01104 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPFAIL
fn rich- ###-####...add ADA signage, p-trap pads, secure & brace shelving. 7/9/2002 3:29:44 PM
BLD02-00845 BLD-Final7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
fn insp shawn ###-#### l/c issued. 7/9/2002 4:14:07 PM
BLD02-01104 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPFAIL
fn rich- ###-####...add ADA signage, p-trap pads, secure & brace shelving. 7/9/2002 3:29:44 PM ok for t/o 7/9/2002 4:13:43 PM
BLD02-00222 BLD-Framing/Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
JEAN ###-####
BLD02-00222 BLD-Foundation7/9/20027/9/20027/9/2002 12:00:00 AMPPART
poured, appears ok
BLD02-00845 BLD-Final7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
fn insp shawn ###-#### l/c issued. 7/9/2002 4:14:07 PM
BLD02-01104 BLD-Final7/8/20027/9/20027/9/2002 12:00:00 AMPFAIL
fn rich- ###-####...add ADA signage, p-trap pads, secure & brace shelving. 7/9/2002 3:29:44 PM ok for t/o 7/9/2002 4:13:43 PM
BLD02-00222 BLD-Framing/Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
JEAN ###-####
BLD02-00222 BLD-Foundation7/9/20027/9/20027/9/2002 12:00:00 AMPPART
poured, appears ok
BLD02-01539 BLD-Foundation7/9/20027/9/20027/9/2002 12:00:00 AMPNR
adrin ###-#### called, left msg... 7/11/2002 11:23:55 AM
BLD02-00933 BLD-Framing/Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 07/09/2002 at 09:43:07. Contact: ###-####. walls ok to cover 7/10/2002 8:23:01 AM
BLD02-00222 BLD-Framing/Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
JEAN ###-####
BLD02-00222 BLD-Framing/Rough-in7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
JEAN ###-####