Inspections for the day of: Tuesday, July 9, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00731 FIRE-Alarm Testing7/3/20027/9/20027/9/2002 12:00:00 AMAPASS
###-#### loren please call 1st alrms tested okay; need rated doors at restroom areas 7/9/2002 10:09:24 AM
BLD02-01296 FIRE-Final Inspection7/8/20027/9/20027/9/2002 12:00:00 AMAFAIL
MIKE ###-#### PLEASE CALL 1/2 HR BEFORE INSP?? need main exit door and hardware; lever hardware on doors to restroom; address 7/9/2002 10:10:52 AM
BLD00-03729 FIRE-Conference7/8/20027/9/20027/9/2002 12:00:00 AMAPART
BRUCE ###-#### FIRE CONF okay to relocate strobe at reception 7/9/2002 10:06:01 AM
BLD02-01104 FIRE-Final Inspection7/8/20027/9/20027/9/2002 12:00:00 AMAPASS
fire fn rich- ###-####
FIR01-00399 INSP-Conference7/9/20027/9/20027/9/2002 12:00:00 AMAPART
Added by Inspector: 409 On 7/9/2002 10:05:40 AM okay to relocate strobe at lobby/reception
FIR02-00241 INSP-Final Inspection7/9/20027/9/20027/9/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 7/9/2002 10:06:58 AM
FIR02-00219 INSP-Final Inspection7/9/20027/9/20027/9/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 7/9/2002 10:07:26 AM
FIR01-00437 INSP-Final Inspection7/9/20027/9/20027/9/2002 12:00:00 AMPFAIL
MARK ###-#### reinspection fee added via e-mail to Linda; need updated plans; sprinkler flow switch sticks; outside bell doesn't work; need tamper for alarm pressure switch; wiring for tamper and in attic area has repeat open splices; strobes not sync'd per plans 7/9/2002 4:36:25 PM
FIR02-00252 INSP-Final Inspection7/9/20027/9/20027/9/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/09/2002 at 09:15:05. Contact: ###-####.