MEC02-01734
| Final | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 11:26:19. Contact: ###-####.
|
MEC02-01370
| Final | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 11:29:19. Contact: ###-####. no access to roof...called ben 7/9/2002 10:36:50 AM
|
MEC02-01841
| Rough-in | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 12:01:35. Contact: ###-####...franklin between maple grove and five mile 7/9/2002 7:32:19 AM
|
MEC02-01841
| Pressure Test | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 12:01:56. Contact: ###-####. one garage test failed 7/9/2002 10:18:27 AM
|
MEC02-01846
| Rough-in | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | FAIL |
|
|
kim ###-#### called kim 7/9/2002 1:13:28 PM
|
MEC02-01846
| Pressure Test | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PASS |
|
|
kim ###-####
|
MEC02-01086
| Final | 7/8/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/08/2002 at 13:46:35. Contact: ###-####.
|
MEC02-01734
| Pressure Test | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | A | PART |
|
|
SANDY ###-#### gas ok...r/i failed..called dave 7/9/2002 9:17:31 AM
|
MEC02-01715
| Final | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 09:08:49. Contact: ###-####. doors locked 7/9/2002 5:32:59 PM
|
MEC02-01715
| Pressure Test | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 09:09:00. Contact: ###-####. doors locked 7/9/2002 5:33:06 PM
|
MEC02-01859
| Pressure Test | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | PASS |
|
|
pres test- chris- ###-####..orchard right on cassia..left on phillippi 7/9/2002 1:17:21 PM
|
MEC02-01861
| Rough-in | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | PASS |
|
|
JEAN ###-####
|
MEC02-01861
| Pressure Test | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | PASS |
|
|
JEAN ###-####
|
MEC02-01748
| Rough-in | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD02-00832
| BLD-Final | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | CANC |
|
|
###-####. Unable to do this this day, as 4 structural inspectors are off today,and overtime is not permitted, i have reschedualed this back for an am inspection. 7/9/2002 6:23:50 PM 7/9/2002 6:24:33 PM
|
MEC02-01201
| Final | 7/9/2002 | 7/9/2002 | 7/9/2002 12:00:00 AM | P | PASS |
|
|
KIM ###-####
|