Inspections for the day of: Wednesday, July 9, 2003.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03633 BLD-Aging Inspection7/9/20037/9/20037/9/2003 12:00:00 AM CANC
BLD03-00494 BLD-Wall cover7/8/20037/9/20037/9/2003 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Kim Olson
energy code ok 7/9/2003 10:20:36 AM
BLD03-00492 BLD-Wall cover7/8/20037/9/20037/9/2003 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Kim Olson
energy code ok 7/9/2003 10:20:48 AM
MEC03-00815 Final7/8/20037/9/20037/9/2003 12:00:00 AMAPASS
Please call Justin ###-#### if access code is needed.; Phone #: ###-#### Internet Inspection Request from: Lena Sloan
MEC03-01775 Rough-in7/8/20037/9/20037/9/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 7/8/2003 at 1:37:44 PM. Contact: ###-####.
BLD02-02277 BLD-Final7/8/20037/9/20037/9/2003 12:00:00 AMAPASS
ROB ###-#### PLEASE CALL THEY HAVE A CODE #
MEC03-01766 Final7/8/20037/9/20037/9/2003 12:00:00 AMAPASS
TML INSTALLER WILL BE ON SIGHT; Phone #: ###-#### Internet Inspection Request from: Veronica England
BLD03-01614 BLD-Foundation7/8/20037/9/20037/9/2003 12:00:00 AMAPART
late morning tom stem wall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
wip 7/9/2003 12:16:08 PM
BLD03-01210 BLD-Framing/Rough-in7/8/20037/9/20037/9/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 7/8/2003 at 6:58:27 PM. Contact: ###-####.
need trades 1st 7/9/2003 2:54:24 PM
BLD03-01532 BLD-Foundation7/9/20037/9/20037/9/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 7/9/2003 at 6:47:28 AM. Contact: ###-####.
MEC03-01785 Pressure Test7/8/20037/9/20037/9/2003 12:00:00 AMPDONE
###-####
meter is set, p.t. done by gas co. 7/9/2003 4:14:45 PM
MEC03-01795 Pressure Test7/9/20037/9/20037/9/2003 12:00:00 AMPDONE
###-#### tml
done by gas co. 7/9/2003 4:16:41 PM
MEC03-01795 Final7/9/20037/9/20037/9/2003 12:00:00 AMPPASS
###-#### tml
BLD03-00596 BLD-Other7/9/20037/9/20037/9/2003 12:00:00 AMPPART
floor joist inspection ###-#### larry
ok to insulate floor 7/9/2003 2:46:09 PM
BLD03-01302 BLD-Footing7/9/20037/9/20037/9/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 7/9/2003 at 10:48:22 AM. Contact: ###-####.
work appears to be ok per plan except soils report has not been done, ok to pour pending soil approval 7/9/2003 3:21:13 PM
MEC03-00417 Final7/9/20037/9/20037/9/2003 12:00:00 AMPPASS