Inspections for the day of: Friday, July 9, 2004.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00239 INSP-Sprinkler Rough-in/Hydro7/8/20047/9/20047/9/2004 12:00:00 AMAPART
Inspection was for the temporary rated corridor on the 1st floor, north side of the south tower. Sprinkler piping is ok to cover. Approximately 6 sprinkler pendants 7/9/2004 10:04:41 AM
FIR04-00365 INSP-Final Inspection7/9/20047/9/20047/9/2004 12:00:00 AMAPASS
Fire sprinklers finaled 7/9/2004 10:05:00 AM
BLD04-00676 FIRE-Final Inspection7/9/20047/9/20047/9/2004 12:00:00 AMPPASS
fire life safety finaled 7/12/2004 9:42:59 AM